Data centres in Japan to drive 60% of electricity demand growth by 2034

With $28 billion in planned investments, hyperscaler expansion in Japan reshapes grid planning amid rising tensions between digital growth and infrastructure capacity.

Share:

Gain full professional access to energynews.pro from 4.90$/month.
Designed for decision-makers, with no long-term commitment.

Over 30,000 articles published since 2021.
150 new market analyses every week to decode global energy trends.

Monthly Digital PRO PASS

Immediate Access
4.90$/month*

No commitment – cancel anytime, activation in 2 minutes.

*Special launch offer: 1st month at the indicated price, then 14.90 $/month, no long-term commitment.

Annual Digital PRO Pass

Full Annual Access
99$/year*

To access all of energynews.pro without any limits

*Introductory annual price for year one, automatically renewed at 149.00 $/year from the second year.

Data centres in Japan are expected to consume the equivalent of the electricity used by 15 to 18 million households by 2034, accounting for 60% of total national power demand growth, according to analysis published by Wood Mackenzie on August 26. This projection is based on an estimated JPY4tn ($28bn) in investments by hyperscalers such as Oracle, Google and Microsoft, recently appointed as official cloud providers by the Japanese government.

Tripled consumption and growing share of peak load

Electricity consumption from data centres in Japan is projected to rise from 19 TWh in 2024 to between 57 TWh and 66 TWh by 2034. Over the same period, peak demand is expected to reach 6.6 to 7.7 GW, or approximately 4% of the country’s peak load, compared to around 1.3% in 2024. Despite this growth, the share of data centres in Japan’s peak demand would remain lower than in the United States, where it could reach 15% by 2034.

“Investment growth remains steady, but the share of demand is still relatively low compared to international benchmarks,” said Naomi Oshita, research associate for Asia Pacific at Wood Mackenzie.

Infrastructure bottlenecks and delays through 2029

Rising demand clashes with infrastructure development timelines. While technology firms aim for deployment in under five years, combined-cycle gas turbine projects require seven to ten years to complete. This mismatch is pushing the commissioning of major data centre and semiconductor foundry projects to 2029.

The Tokyo and Kansai metropolitan regions are expected to absorb most of the demand, as operators prioritise access to consumption hubs and network latency. According to Wood Mackenzie, data centres will account for about 7% of the power load in these regions by 2030. Reserve margins above 15% should, however, prevent immediate shortages.

Energy mix dominated by fossil fuels

Most data centre electricity supply will continue to come from coal and gas, which will represent more than 40% of installed capacity in the target regions by 2034. This reliance complicates climate goals pursued by digital players while reinforcing their influence on Japan’s energy demand.

“The decarbonisation challenge is particularly acute given the scale of growth expected,” said Oshita. With renewables limited to 17% of the energy mix by 2030, Japan will need to accelerate nuclear restarts and renewable deployment to reconcile climate targets with supply continuity.

A shifting power system model

The scale of expected consumption will structurally alter Japan’s power demand profile over the next decade. Data centres will become a central factor in electricity sector investment planning.

“The question is not whether Japan will reach US levels, but how fast its power system can keep up,” Oshita concluded. “Utilities must adapt their model even as the transformation is already underway.”

US-based Madison secures $800mn debt facility to finance energy infrastructure projects and address rising grid demand across the country.
The announced merger between Anglo American and Teck forms Anglo Teck, a new copper-focused leader structured for growth, with a no-premium share structure and a $4.5bn special dividend.
Voltalia launches a transformation programme targeting a return to profit from 2026, built on a refocus of activities, a new operating structure and self-financed growth of 300 to 400 MW per year.
Ineos Energy ends all projects in the UK, citing unstable taxation and soaring energy costs, and redirects its investments to the US, where the company has just allocated £3bn to new assets.
Eskom forecasts a load-shedding-free summer after covering 97% of winter demand, supported by 4000 MW added capacity and reduced operating expenses.
GE Vernova will cut 600 jobs in Europe, with the Belfort gas turbine site in France particularly affected, amid financial growth and strategic reorganisation.
SOLV Energy expands its nationwide services in the United States with the acquisitions of Spartan Infrastructure and SDI Services, consolidating its presence across all independent power markets.
Tokenised asset platform Plural secures $7.13mn to accelerate financing of distributed infrastructure including solar, storage, and data centres.
Santander Alternative Investments has invested in Corinex to accelerate the deployment of its smart grid solutions, aiming to address growing utility needs in Europe and the Americas.
Driven by grid modernisation and industrial automation, the global control transformer market could reach $1.48bn in 2030, with projections indicating steady growth in energy-intensive sectors.
A report from energy group Edison highlights structural barriers slowing renewable deployment in Italy, threatening its ability to meet 2030 decarbonisation targets.
ADNOC Group CEO Dr Sultan Al Jaber has been named 2025 CEO of the Year by his global chemical industry peers, recognising his role in the company’s industrial expansion and international investments.
Swedish renewable energy developer OX2 has appointed Matthias Taft as its new chief executive officer, succeeding Paul Stormoen, who led the company since 2011 and will now join the board of directors.
Driven by distributed solar and offshore wind, renewable energy investments rose 10% year-on-year despite falling financing for large-scale projects.
Australian Oilseeds Holdings was granted a deadline extension until 30 September to comply with the Nasdaq’s equity requirements, avoiding immediate delisting from the exchange.
Fermi America has closed $350mn in financing led by Macquarie to accelerate the development of its HyperGrid™ energy campus, focused on artificial intelligence and high-performance data applications.
Soluna Holdings launched two energy projects in Texas, reaching one gigawatt of cumulative capacity for its data centres, marking a new stage in the development of computing infrastructure powered by renewable energy.
Eneco’s Supervisory Board has appointed Martijn Hagens as the next Chief Executive Officer. He will succeed interim CEO Kees Jan Rameau, effective from 1 March 2026.
The suspension of the Revolution Wind farm triggers a sharp decline in Ørsted’s stock, now trading at around 26 USD, increasing the financial stakes for the group amid a capital increase.
Hydro-Québec reports net income of C$2.3 billion in the first half of 2025, up more than 20%, driven by a harsh winter and an effective arbitrage strategy on external markets.

Log in to read this article

You'll also have access to a selection of our best content.