Canada Infrastructure Bank invests CAD 217 million in Nova Scotia – New Brunswick interconnection

The Canada Infrastructure Bank (CIB) has committed a CAD 217 million investment to support the construction of a transmission line between Nova Scotia and New Brunswick, enhancing the reliability of the interprovincial power grid.

Share:

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

The Canada Infrastructure Bank (CIB) has secured an equity investment of CAD 217 million to facilitate the construction of a transmission line linking Nova Scotia and New Brunswick. This project aims to improve the reliability of interprovincial power grids and support the expansion of renewable energy production in both provinces.

This funding will enable Nova Scotia to build a 160-kilometre, 345-kilovolt transmission line, following the route of the existing connection between Onslow (Nova Scotia) and Salisbury (New Brunswick). The interconnection is part of a broader effort to strengthen the region’s energy infrastructure, enhance grid resilience, and foster electricity exchanges between the provinces.

Partnership with Indigenous Communities

In parallel, the CIB is collaborating with the Wskijinu’k Mtmo’taqnuow Agency Ltd. (WMA), an economic partnership owned by the 13 Mi’kmaq nations of Nova Scotia. The CIB and WMA aim to finalise an equity loan to enable the latter to acquire a stake in the project. This financing is part of the CIB’s Indigenous Equity Initiative, which aims to increase Indigenous participation in infrastructure projects.

Economic Impact and Employment

The project is expected to generate nearly 587 direct and indirect jobs during its construction, while contributing CAD 105 million to the Gross Domestic Product (GDP). The works are scheduled for completion by autumn 2028. Furthermore, the CIB’s investment is projected to save electricity consumers in Nova Scotia approximately CAD 200 million.

The Strategic Role of the Interconnection

This transmission line is part of a larger project aimed at improving energy connectivity in the Atlantic region and strengthening Canada’s overall energy security. By increasing the capacity of the interprovincial power grid, the project facilitates electricity exchanges between the two provinces while supporting the transition to cleaner energy sources. The project is also seen as an example of interprovincial collaboration in the energy sector.

A First for the Canada Infrastructure Bank

This marks the CIB’s first equity investment, having previously committed CAD 743 million across five energy projects in the Atlantic region. These projects include wind farms, energy storage infrastructure, and other essential interconnections. As part of its clean energy sector, the CIB aims to achieve a target of CAD 10 billion in investments for new energy projects, including renewable energy, energy storage, and district heating systems.

Federal Support for the Energy Transition

The federal government is actively supporting the project through several financing mechanisms, including a CAD 3.1 million pre-development programme to support preparatory activities related to the interconnection. This support aims to strengthen the energy transition towards a more reliable, clean, and affordable power grid for Canadians. It is part of a long-term vision for grid modernisation, aligned with the country’s climate and economic goals.

Facing a structural electricity surplus, the government commits to releasing a new Multiannual Energy Programme by Christmas, as aligning supply, demand and investments becomes a key industrial and budgetary issue.
A key scientific report by the United Nations Environment Programme failed to gain state approval due to deep divisions over fossil fuels and other sensitive issues.
RTE warns of France’s delay in electrifying energy uses, a key step to limiting fossil fuel imports and supporting its reindustrialisation strategy.
India’s central authority has cancelled 6.3 GW of grid connections for renewable projects since 2022, marking a tightening of regulations and a shift in responsibility back to developers.
The Brazilian government has been instructed to define within two months a plan for the gradual reduction of fossil fuels, supported by a national energy transition fund financed by oil revenues.
The German government may miss the January 2026 deadline to transpose the RED III directive, creating uncertainty over biofuel mandates and disrupting markets.
Italy allocated 82% of the proposed solar and wind capacities in the Fer-X auction, totalling 8.6GW, with competitive purchase prices and a strong concentration of projects in the southern part of the country.
Amid rising public spending, the French government has tasked two experts with reassessing the support scheme for renewable electricity and storage, with proposals expected within three months.
National operator PSE partners with armed forces to protect transformer stations as critical infrastructure faces sabotage linked to foreign interference.
The Norwegian government establishes a commission to anticipate the decline of hydrocarbons and assess economic options for the country in the coming decades.
Kazakhstan plans to allocate 3 GW of wind and solar projects by the end of 2026 through public tenders, with a first 1 GW tranche in 2025, amid efforts to modernise its power system.
Hurricanes Beryl, Helene and Milton accounted for 80% of electricity outages recorded in 2024, marking a ten-year high according to federal data.
The French Energy Regulatory Commission introduces a temporary prudential control on gas and electricity suppliers through a “guichet à blanc” opening in December, pending the transposition of European rules.
The Carney–Smith agreement launches a new pipeline to Asia, removes oil and gas emission caps, and initiates reform of the Pacific north coast tanker ban.
The gradual exit from CfD contracts is turning stable assets into infrastructures exposed to higher volatility, challenging expected returns and traditional financing models for the renewable sector.
The Canadian government introduces major legislative changes to the Energy Efficiency Act to support its national strategy and adapt to the realities of digital commerce.
Quebec becomes the only Canadian province where a carbon price still applies directly to fuels, as Ottawa eliminated the public-facing carbon tax in April 2025.
New Delhi launches a 72.8 bn INR incentive plan to build a 6,000-tonne domestic capacity for permanent magnets, amid rising Chinese export restrictions on critical components.
The rise of CfDs, PPAs and capacity mechanisms signals a structural shift: markets alone no longer cover 10–30-year financing needs, while spot prices have surged 400% in Europe since 2019.
Germany plans to finalise the €5.8bn ($6.34bn) purchase of a 25.1% stake in TenneT Germany to strengthen its control over critical national power grid infrastructure.

All the latest energy news, all the time

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.