Barcelona inaugurates the first urban network utilizing residual cold from an LNG terminal

A world first: Barcelona leverages residual cold from an LNG terminal to generate 131 GWh of low-carbon energy annually, reducing 32,000 tons of CO2 emissions while strengthening its energy competitiveness.

Share:

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

The city of Barcelona, in partnership with Veolia and Enagás, has officially launched the first urban network using residual cold from the regasification of liquefied natural gas (LNG). Located in the Port of Barcelona, this innovative project represents a major milestone for energy transition and the decarbonization of local infrastructure.

In LNG regasification terminals, LNG, transported by ships at a temperature of -160°C, is converted into natural gas at ambient temperature using seawater. Thanks to innovative technology developed by Enagás and Veolia, this process recovers and valorizes the residual cold to power a low-carbon energy network. This sustainable energy is distributed to strategic infrastructures such as the Fira de Barcelona and the offices of the Generalitat de Catalunya.

An exemplary energy efficiency project

Each year, this network generates 131 GWh of low-carbon energy, equivalent to the consumption of a city like Reus in Catalonia, with 100,000 inhabitants. Moreover, it prevents 32,000 tons of CO2 emissions annually, corresponding to 110 round trips between Barcelona and New York.

This project is part of Veolia’s GreenUp strategy, dedicated to the ecological transformation of the energy mix. Arturo Gonzalo, CEO of Enagás, emphasized that this technology, applicable to over 150 regasification terminals worldwide, could play a crucial role in harnessing untapped energy resources while enhancing energy sovereignty.

A model of public-private collaboration

This project, initiated in 2009, is the result of close cooperation between Veolia, Enagás, and the municipality of Barcelona. This synergy has enabled the development of a solution tailored to local energy needs, while also boosting the competitiveness of the region’s port and tertiary infrastructures.

An agreement has also been signed with Mercabarna, Barcelona’s main food market. This partnership aims to supply eight pavilions dedicated to fruits, vegetables, and seafood with the cold energy generated by the LNG terminal. This initiative highlights the direct impact of this technology on the industrial and commercial sectors.

An internationally replicable solution

The success of this project opens global opportunities. Veolia and Enagás have signed an agreement to replicate this model in other terminals in Spain and abroad. “We must leverage all untapped energy potential to reduce waste and inefficiency,” said Estelle Brachlianoff, CEO of Veolia. This project demonstrates the feasibility of local solutions to address global energy transition challenges.

Through this innovation, Barcelona positions itself as a global reference for energy efficiency and resilience to climate change while offering a concrete response to decarbonization challenges.

Amid an expected LNG surplus from 2026, investors are reallocating positions toward the EU carbon market, betting on tighter supply and a bullish price trajectory.
Axiom Oil and Gas is suing Tidewater Midstream for $110mn over a gas handling dispute tied to a property for sale in the Brazeau region, with bids due this week.
Tokyo Gas has signed a 20-year agreement with US-based Venture Global to purchase one million tonnes per year of liquefied natural gas starting in 2030, reinforcing energy flows between Japan and the United States.
Venture Global accuses Shell of deliberately harming its operations over three years amid a conflict over spot market liquefied natural gas sales outside long-term contracts.
TotalEnergies ends operations of its Le Havre floating LNG terminal, installed after the 2022 energy crisis, due to its complete inactivity since August 2024.
Golar LNG has completed a $1.2bn refinancing for its floating LNG unit Gimi, securing extended financing terms and releasing net liquidity to strengthen its position in the liquefied natural gas market.
Woodside Energy and East Timor have reached an agreement to assess the commercial viability of a 5 million-tonne liquefied natural gas project from the Greater Sunrise field, with first exports targeted between 2032 and 2035.
In California, electricity production from natural gas is falling as solar continues to rise, especially between noon and 5 p.m., according to 2025 data from local grid authorities.
NextDecade has launched the pre-filing procedure to expand Rio Grande LNG with a sixth train, leveraging a political and commercial context favourable to US liquefied natural gas exports.
Condor Energies has completed drilling its first horizontal well in Uzbekistan, supported by two recompletions that increased daily production to 11,844 barrels of oil equivalent.
WhiteWater expands the Eiger Express pipeline in Texas, boosting its transport capacity to 3.7 billion cubic feet per day following new long-term contractual commitments.
The challenge to permits granted for the NESE project revives tensions between gas supply imperatives and regulatory consistency, as legal risks mount for regulators and developers.
Brasilia is preparing a regulatory overhaul of the LPG sector to break down entry barriers in a market dominated by Petrobras and four major distributors, as the Gás do Povo social programme intensifies pressure on prices.
The lifting of force majeure on the Rovuma LNG project puts Mozambique back on the global liquefied natural gas map, with a targeted capacity of 18 Mt/year and a narrowing strategic window to secure financing.
BW Energy has identified liquid hydrocarbons at the Kudu gas field in Namibia, altering the nature of the project initially designed for electricity production from dry gas.
Rising oil production in 2024 boosted associated natural gas to 18.5 billion cubic feet per day, driven by increased activity in the Permian region.
Sonatrach has concluded a new partnership with TotalEnergies, including a liquefied natural gas supply contract through 2025, amid a strategic shift in energy flows towards Europe.
McDermott has signed a contract amendment with Golden Pass LNG Terminal to complete Trains 2 and 3 of the liquefied natural gas export terminal in Texas, continuing its role as lead partner on the project.
Exxon Mobil will acquire a 40% stake in the Bahia pipeline and co-finance its expansion to transport up to 1 million barrels per day of natural gas liquids from the Permian Basin.
The German state is multiplying LNG infrastructure projects in the North Sea and the Baltic Sea to secure supplies, with five floating terminals under public supervision under development.

All the latest energy news, all the time

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.