Amp Energy announces Europe’s largest energy storage project

Share:

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

The portfolio is scheduled to be operational in April 2024 and will comprise two 400 MW battery installations.
Following consultation with stakeholders and local councils, both sites received planning permission from the Scottish Government’s Energy Consents Unit on January 5, 2022.
The 400 MW batteries will be the two largest grid-connected battery storage facilities in Europe.
The projects will provide reliable grid stability and energy management services in Scotland’s central belt, including Glasgow and Edinburgh.
By storing and managing the dispatch of renewable energy generated by Scotland’s wind farms, the projects are paving the way for the future of the UK’s electricity infrastructure at a fraction of the cost of expensive transmission upgrades.
Setting the global standard for energy storage, the projects, located in Hunterston and Kincardine, represent a major step forward for the UK in achieving its net-zero energy target.
Following ScotWind ‘s recent offshore wind announcement, which sees the addition of 25 GW of new renewable generation capacity, the need for large-scale energy storage capable of moving energy and providing grid stability services is even more crucial.
Over the next few years, Amp’s battery installations in Scotland will enable up to 1750 GWh a year of additional renewable energy to be generated in Scotland and transported to other parts of the UK, equivalent to enabling the deployment of around 500 MW of new offshore wind turbines.
The Hunterston and Kincardine projects are also part of National Grid’s Scottish Stability Pathfinder 2 tender, which aims to address the voltage and stability issues facing the UK electricity grid.
Amp’s facilities will deploy state-of-the-art inverter technology for grid formation, as well as two new synchronous condenser installations that also contribute to grid stabilization.
The Scottish green battery complex will be optimized and distributed by Amp X, Amp’s proprietary digital energy platform powered by artificial intelligence.
Amp X leverages its proprietary, already bankable, transaction-ready system architecture and advanced state-of-the-art analytics hosted in the cloud.
Operating autonomously, the platform provides solutions to grid constraints, offering flexibility and enabling end-to-end energy transition.

The collapse in storage costs positions batteries as a key lever for dispatchable solar, but dependence on Chinese suppliers creates growing tension between competitiveness and supply chain security.
JA Solar has launched a microgrid combining 5.2 MW of solar and 2.61 MWh of storage at an industrial site in Sicily, marking its first application of the "PV+Storage+X" model in Italy.
Sinexcel has installed a 2MW/8MWh energy storage system in Matsusaka, marking a breakthrough in a regulated market after five years of technical partnerships and gradual deployment in Japan.
Inlyte Energy has successfully completed factory validation testing of its first full-scale iron-sodium battery, witnessed by Southern Company, paving the way for a pilot installation in the United States in early 2026.
Neoen begins construction of a new 305 MW stage in Australia, raising its total battery storage capacity in the country to 2 GW, and signs two additional virtual battery contracts with ENGIE.
ENGIE has awarded NHOA Energy the contract for a 320 MWh battery energy storage system in Drogenbos, marking a new step in their industrial partnership in Belgium.
Stardust Power has completed an independent review of its lithium refinery project in Muskogee, confirming technical feasibility and compliance with industry standards for its initial production phase.
California-based battery manufacturer South 8 Technologies has secured $11mn to boost production of its LiGas cells, targeting military and space applications under extreme conditions.
Samsung SDI will supply LFP cells for energy storage systems in the United States starting in 2027, under a multi-year deal valued at $1.53bn.
Bitzero Holdings launches a new 70 MW expansion phase in Namsskogan, Norway, targeting a total capacity of 110 MW and an upgrade of its high-performance computing capabilities.
Remixpoint and Nippon Chikudenchi have formalised a partnership to develop seven 2MW/8MWh BESS facilities by October 2026 through a newly established joint venture.
UK-based Ray Systems has selected Beam Global to supply tailored battery systems for its new autonomous underwater drones, aiming to extend mission duration without compromising stealth or manoeuvrability.
Sungrow has started construction on a 200 MW/400 MWh battery storage system for ENGIE, aimed at strengthening grid stability in a state heavily reliant on renewable energy.
Blue Current secures over $80mn in funding led by Amazon to industrialise its silicon solid-state batteries for large-scale mobility and stationary applications.
AGL has begun construction of a 500 MW battery storage system in Tomago, a project valued at AUD800mn ($530.8mn), in the Hunter region, with commissioning expected in 2027.
Real estate group JALCO Holdings diversifies its activities by investing in a 2 MW/8.1 MWh battery energy storage system developed by Taoke Energy in Narita, Chiba Prefecture.
BKW is conducting feasibility studies on four sites to assess the profitability and development conditions for large-scale battery storage installations in Switzerland.
A 300 MW/1,200 MWh electrochemical energy storage facility has been commissioned in China, marking a major milestone in the country’s largest publicly funded energy infrastructure project.
Sustainable Holdings is developing a battery storage facility in Matsusaka, with operations scheduled to begin in June 2026 on Japan’s electricity market.
California-based Korbel Winery is now equipped with an integrated energy storage and intelligent control system, installed by Energy Toolbase and BPi, to optimise usage and address local grid constraints.

All the latest energy news, all the time

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.