Sweden: Valdemarsvik hosts modular nuclear reactor project

Kärnfull Next and Latona Group are working together to develop an SMR site in Valdemarsvik, targeting sustainable energy production and local economic opportunities.

Share:

Projet réacteurs modulaires Valdemarsvik

Modular nuclear reactor (SMR) developer Kärnfull Next recently announced the municipality of Valdemarsvik in Östergötland County, southeast Sweden, as a candidate site for up to six reactors. An exclusive partnership has been established with Latona Group, the landowner, for nuclear exploration rights on the site. Initial studies, due for completion after the summer, are showing promising results.

“The location, topography and cooling conditions of a forward-looking municipality with extensive rural areas are examples of positive indications of the current phase,” said Kärnfull Next.

The project could create around 500 direct and indirect jobs per year for the next 70 years.

A strategic site for tomorrow’s energy

The proposed site, covering over 1,300 hectares, has been identified as suitable for nuclear power since the 1970s. Its vast coastal area makes it suitable for co-location with energy-intensive industries of the 2030s, such as data centers for AI. This development is part of Kärnfull Next’s Re:Firm South SMR program, aimed at expanding carbon-free energy production in southern Sweden. The Valdemarsvik SMR campus is initially planned to accommodate between four and six small light water reactors, adding between 10 and 15 TWh of electricity production per year.

According to Christian Sjölander, CEO of Kärnfull Next, “this site has the potential to become a key part of our program to supply large quantities of stable, sustainable energy.”

Economic and social outlook

Gustav Carp, owner of Latona Group, expressed his enthusiasm for the collaboration, highlighting the site’s unique favorable conditions for nuclear power generation.

“We are very pleased to be working with Kärnfull Next on this exciting project, which can create significant value for Valdemarsvik and its residents.”

In March 2022, Kärnfull Next signed a memorandum of understanding with GE Hitachi Nuclear Energy for the deployment of the BWRX-300 in Sweden. The company has been conducting feasibility and site selection studies in several Swedish municipalities since 2022.

Future projects and regional impact

In August 2023, Nyköping was announced as another candidate site for the program. Kärnfull Next expects further feasibility studies to reach sufficient levels of maturity to be announced later this year. Establishing several SMR parks in the same program should enable economies of scale in terms of technology selection, construction partners, power purchase agreements and financial partners.
The SMR project at Valdemarsvik represents a significant opportunity for the region, not only in terms of sustainable energy production, but also in terms of job creation and local economic development. With favorable prospects and strategic collaborations, this project could mark a major breakthrough for nuclear energy in Sweden.

Energoatom signed strategic agreements with Westinghouse and Holtec at the Ukraine Recovery Conference, aiming to establish nuclear fuel production and small modular reactor capabilities in the country.
Tehran agrees to reopen its nuclear facilities to the IAEA, aiming to resume negotiations with Washington, while Moscow pushes for a “zero enrichment” agreement without getting involved in supervision.
TerraPower has selected three new American suppliers for its advanced Natrium nuclear reactor, confirming progress on the project located in Kemmerer, Wyoming, intended to replace a retiring coal-fired power plant.
Energy Exploration Technologies acquires Daytona Lithium, an Australian subsidiary of Pantera Lithium, for AUD40mn ($27mn), bringing its strategic lithium basin footprint in Smackover, USA to nearly 50,000 acres.
The Canadian Nuclear Safety Commission has identified no major barriers to licensing the ARC-100 reactor, announces ARC Clean Technology.
SE Ignalina, the Lithuanian nuclear operator, has signed a memorandum of understanding with French firm Newcleo to explore the integration of small modular reactors (SMRs) using lead-cooled fast reactor (LFR) technology in Lithuania.
Egyptian President Abdel Fattah al-Sisi oversaw the signing of new agreements for the construction of the El Dabaa nuclear power plant, thus strengthening the strategic cooperation between Egypt and Russia.
Vistra Corp receives green light to extend Perry nuclear plant operations in Ohio by 20 years, securing regional electricity supply until 2046 and ensuring operational continuity for all its nuclear reactors in the United States.
EDF will hold a 12.5% stake in the Sizewell C nuclear project in the UK, a €1.3 billion investment announced during Emmanuel Macron’s official visit to London, confirming the strategic nuclear energy alignment between the two countries.
The French Cigéo project, designed to bury the most hazardous radioactive waste deep underground, obtains a crucial technical validation before its final authorization, expected by the end of 2027.
EDF confirms the continuation of its industrial project in Fessenheim for recycling very low-level radioactive metals, a first in France requiring specific regulatory authorizations, following a public debate concluded last February.
NANO Nuclear Energy Inc. formalizes its collaboration with UrAmerica Ltd. to strengthen Argentina’s uranium supply, aiming to secure future nuclear fuel supply chains for the U.S. market.
American companies SHINE Technologies and Standard Nuclear partner to recycle uranium and plutonium, supplying advanced fuel to the nuclear reactor sector and enhancing the national energy security of the United States.
The American Bureau of Shipping and two nuclear sector companies are studying the potential deployment of floating nuclear power plants to meet the energy needs of island and coastal regions in the Mediterranean, notably via electricity and desalination.
Lithuania establishes a working group tasked with assessing the feasibility of modular nuclear reactors to meet electricity demand estimated at 74 TWh by 2050.
Framatome has secured two significant contracts from Electrabel covering modernisation and technical support for the Tihange 3 and Doel 4 nuclear reactors, as part of their extension agreed upon between Engie and the Belgian government.
Cairo is stepping up connection works for the planned 4,800 MW El-Dabaa nuclear plant, developed with Rosatom, to feed the grid from 2026 with output equal to about seven % of national electricity.
EDF extends Flamanville EPR's shutdown to August 13 to conduct technical checks on three valves of the reactor's primary circuit, initially scheduled to resume production this week.
The US Department of Energy has selected Westinghouse and Radiant Nuclear to conduct the first nuclear microreactor tests at the DOME experimental centre located in Idaho, with operational start expected in spring 2026.
GE Vernova Hitachi Nuclear Energy and Fortum announce partnership aimed at preparing for the potential deployment of small modular reactors in Finland and Sweden, with commissioning scheduled for the 2030s.