Flamanville EPR: New schedule confirmed

After a twelve-year delay, EDF has announced that the first electricity from the Flamanville EPR will be injected into the national grid in summer 2024.

Share:

EPR Flamanville démarrage été 2024

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

EDF recently updated the commissioning schedule for theFlamanville EPR, announcing a first connection to the national grid scheduled for summer 2024. This announcement follows earlier adjustments aimed at a network launch in mid-2024. These changes follow the announcement by the French nuclear safety authority (ASN) that fuel loading would be postponed until mid-April. “The Flamanville 3 EPR is technically ready for commissioning,” said EDF, despite the many delays accumulated on this project.

ASN public consultation

The ASN has launched a public consultation from March 27 to April 17, 2024 concerning the commissioning of the Flamanville 3 EPR. This essential regulatory step raised fears of further delays to the project, which was already marked by cost and schedule overruns. However, EDF remains optimistic, seeing this procedure as a prerequisite for the first loading of nuclear fuel into the reactor in the coming weeks.

Steps to commissioning

After fuel loading, reactor start-up operations will continue, including boiler temperature and pressure build-up, followed by reactor power-up. EDF specifies that, at 25% power, the unit will be connected to the national grid, a crucial milestone in the process of commissioning the Flamanville EPR.

The financial implications of delay

Startup of the EPR will finally take place twelve years late, bringing the total cost of the project to 13.2 billion euros, four times the initial budget. These delays and budget overruns illustrate the challenges facing EDF in the development of 3rd generation reactors (EPR) in France and Europe, against a backdrop of renewed interest in nuclear energy.

Faced with these challenges, EDF aims to deploy EPR reactors on an industrial scale in France and Europe, with a target of “two per year”. This ambitious outlook is being put to the test by historical cost and schedule slippages, as exemplified by the Flamanville EPR. Faced with considerable debt, the group is also at the heart of a relaunched nuclear program in France, planning up to 18 EPR2 reactors, while managing its nuclear projects in the UK.

Videberg Kraft AB becomes the first company to request government support to build two new reactors at the Ringhals site, under the national nuclear investment framework adopted in 2025.
The European Commission opens an in-depth investigation into Prague's public funding of a major nuclear project, which could reach €30bn ($32.88bn), with guaranteed revenues over forty years.
Niigata's assembly officially backs the restart of the Kashiwazaki-Kariwa site, marking a key step in Japan’s return to nuclear energy following the 2011 Fukushima disaster.
The Japanese government plans to fund up to 30% of loans required for nuclear projects, aiming to accelerate reactor restarts and double the share of nuclear energy in its energy mix by 2040.
French nuclear reactor developer Newcleo has submitted its lead-cooled small modular reactor design to Euratom, initiating the first regulatory phase to integrate nuclear non-proliferation safeguards at the European level.
California-based startup Radiant has secured $300mn to build its first factory in Tennessee and prepare for the mass production of miniature nuclear reactors for off-grid applications.
Terra Innovatum has increased its interactions with the Nuclear Regulatory Commission to advance licensing of its SOLO™ micro-modular reactor, despite the partial shutdown of the US federal government.
The US nuclear regulator has extended the operating licences of three Illinois reactors by 20 years, strengthening Constellation's long-term industrial outlook for the Clinton and Dresden sites.
The SATURNE Industrial Chair aims to develop innovative uranium extraction methods, with joint funding from Orano and the National Research Agency over a four-year period.
US-based X-energy has signed a reservation agreement with South Korea's Doosan Enerbility to secure key components for its small modular nuclear reactors.
Niger expands its mining alliances with Uranium One to develop new sites, while the Dasa project continues seeking financing despite clear political backing.
Samsung Heavy Industries has received Approval in Principle for a floating nuclear plant featuring two SMART100 reactors, marking a step toward the commercialisation of offshore small modular reactors.
The Indian government proposes a unified legal framework for nuclear energy, aiming to boost private investment and increase installed capacity to 100 GW by 2047.
Samsung C&T strengthens its presence in modular nuclear energy in Europe by signing an agreement with Synthos Green Energy to develop up to 24 SMRs in Poland and several Central European countries.
Israeli firm nT-Tao and Ben-Gurion University have developed a nonlinear control system that improves energy stability in fusion plasmas, strengthening the technical foundation of their future compact reactors.
The Indian government has introduced a bill allowing private companies to build and operate nuclear power plants, ending a state monopoly in place for over five decades.
Natura Resources enters a new regulatory phase for its molten salt reactor MSR-1, following the signing of a framework agreement with the US Department of Energy under the Reactor Pilot Program.
Norwegian Nuclear Decommissioning is surveying 22 localities to assess their interest in hosting storage facilities for radioactive waste from the country’s former research reactors.
Electricité de France's Flamanville 3 reactor has reached full power for the first time, marking a key industrial milestone in the deployment of EPRs in Europe, despite cost overruns reaching EUR23.7bn ($25.7bn).
GE Vernova Hitachi’s BWRX-300 small modular reactor has passed a key regulatory hurdle in the United Kingdom, opening the door to potential commercial deployment, despite no current plans for construction.

All the latest energy news, all the time

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.