Intense debate on the Alsace LNG Project

A liquefied natural gas (LNG) storage and distribution project in Alsace is facing fierce opposition, despite the ecological arguments put forward by its operators.

Share:

GNL en Alsace: Débat Intensifié

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

The project to create a liquefied natural gas (LNG) storage and distribution site on the outskirts of Strasbourg is generating intense debate. Located on a former refinery site, the project involves the installation of five LNG storage tanks. This gas, which is cooled to -162°C to liquefy it, takes up less space. The site, classified Séveso high threshold, will receive imported gas, transported from Fos-sur-Mer to Alsace.

Opposition and Environmental Criticism

This LNG, mainly intended as fuel for road hauliers, would be distributed to service stations in northeastern France and Germany. Stéphane Simon, Director at Rubis terminal, underlines the importance of LNG in the energy conversion of heavy transport, seeing it as an available and functional solution. He points to the lack of an LNG hub in the Grand Est region, which is currently dependent on truck supplies from Fos-sur-mer. In his view, the establishment of a local hub would promote the region’s energy transition.

Challenges of the Transition to BioGNL

However, the project faces stiff opposition. Critics, such as Marie Chéron of the NGO Transport et Environnement, question investment in a technology deemed to have no future. Although less polluting than diesel, LNG is still a hydrocarbon that contributes to global warming. The Environmental Authority questions the project’s contribution to the energy transition, highlighting its carbon content.

Local Issues and Community Reactions

The towns where the plant is located, Reichstett and Vendenheim, as well as the Strasbourg metropolitan area, have expressed negative opinions, fearing saturation of road traffic and other nuisances. Georges Schuler, mayor of Reichstett, highlights the problems associated with increased traffic and restrictions on the development of other forms of renewable energy in the vicinity of a Séveso site.

However, the project’s promoters advocate the use of gas as a viable alternative to electric power for heavy-duty transport. They highlight the potential of bioGNL, a less polluting renewable energy produced from organic matter. The inclusion of bioNGL in the incentive tax on the use of renewable energy in transport (Tiruert) could speed up the transition to this energy. Project partner Laurent Hamou from Elengy talks about the challenges of producing bioNGL and the current lack of liquefaction infrastructure in the Grand Est region, but remains optimistic about the possibility of 100% regional bioNGL storage by 2030.

The LNG storage and distribution project in Alsace raises crucial questions about the balance between energy transition and environmental preservation.

The European Bank for Reconstruction and Development strengthens its commitment to renewables in Africa by supporting Infinity Power’s solar and wind expansion beyond Egypt.
Governor Gavin Newsom attended the COP30 summit in Belém to present California as a strategic partner, distancing himself from federal policy and leveraging the state's economic weight.
Chinese authorities authorise increased private sector participation in strategic energy projects, including nuclear, hydropower and transmission networks, in an effort to revitalise slowing domestic investment.
A new regulatory framework comes into effect to structure the planning, procurement and management of electricity transmission infrastructure, aiming to increase grid reliability and attract private investment.
À l’approche de la COP30, l’Union africaine demande une refonte des mécanismes de financement climatique pour garantir des ressources stables et équitables en faveur de l’adaptation des pays les plus vulnérables.
Global energy efficiency progress remains below the commitments made in Dubai, hindered by industrial demand and public policies that lag behind technological innovation.
Global solar and wind additions will hit a new record in 2025, but the lack of ambitious national targets creates uncertainty around achieving a tripling by 2030.
South Korean refiners warn of excessive emissions targets as government considers cuts of up to 60% from 2018 levels.
Ahead of COP30 in Belém, Brazilian President Luiz Inacio Lula da Silva adopts a controversial stance by proposing to finance the energy transition with proceeds from offshore oil exploration near the Amazon.
An international group of researchers now forecasts a Chinese emissions peak by 2028, despite recent signs of decline, increasing uncertainty over the country’s energy transition pace.
The end of subsidies and a dramatic rise in electricity prices in Syria are worsening poverty and fuelling public discontent, as the country begins reconstruction after more than a decade of war.
Current emission trajectories put the planet on course for a 2.3°C to 2.5°C rise, according to the latest UN calculations, just days before the COP30 in Belem.
The Australian government plans to introduce a free solar electricity offer in several regions starting in July 2026, to optimize the management of the electricity grid during peak production periods.
India is implementing new reforms to effectively integrate renewable energy into the national grid, with a focus on storage projects and improved contracting.
China added a record 264 GW of wind and solar capacity in the first half of 2025, but the introduction of a new competitive pricing mechanism for future projects may put pressure on prices and affect developer profitability.
The government confirmed that the majority sale of Exaion by EDF to Mara will be subject to the foreign investment control procedure, with a response expected by the end of December.
A week before COP30, Brazil announces an unprecedented drop in greenhouse gas emissions, driven mainly by reduced deforestation, with uneven sectorial dynamics, amid controversial offshore oil exploration.
The Catabola electrification project, delivered by Mitrelli, marks the first connection to the national grid for several communities in Bié Province.
The Algerian government plans a full upgrade of the SCADA system, managed by Sonelgaz, to improve control and supervision of the national electricity grid starting in 2026.
Facing annual losses estimated at up to $66mn, SEEG is intensifying field inspections and preparing the rollout of smart meters to combat illegal connections.

All the latest energy news, all the time

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.