Romania’s NuScale SMR plan gets $275 million boost

The VOYGR-6 SMR nuclear power plant project in Romania will receive substantial financing, with a letter of interest from the U.S. EXIM Bank and potential financial support from several other agencies.

Share:

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25€/month*

*billed annually at 99€/year for the first year then 149,00€/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2€/month*
then 14.90€ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

The announced financing includes a Letter of Interest from the Export-Import Bank of the United States (EXIM) for up to $99 million under the EXIM Engineering Multiplier program. This funding will support the procurement of “long lead time materials, Phase 2 FEED design work, provision of project management expertise, site characterization and regulatory analysis, and development of a site-specific schedule and budget for project execution.”

EXIM and the U.S. International Development Finance Corporation have also issued Letters of Interest for “potential financial support of up to $3 billion and $1 billion, respectively, for project deployment.” The announcement is part of the G7 leaders’ plan to “mobilize $600 billion in infrastructure investment through the Global Infrastructure and Investment Partnership.

Phase 1 of the project in progress

NuScale and RoPower Nuclear, jointly owned by Nuclearelectrica and Nova Power and Gas of Romania, are conducting a Phase 1 study to analyze the preferred site for the first VOYGR-6 SMR nuclear power plant, which is a former coal-fired power plant in Doicesti, Romania. The new funding will support the Phase 2 study, which will also initiate the permitting and licensing process for the project.

Nuclearelectrica said that the partners involved in financing the project are the Japan Bank for International Cooperation, DS Private Equity (Korea), EXIM Bank of Romania, Nuclearelectrica, Nova Power & Gas, Emirates Nuclear Energy Corporation (ENEC), DFC and US EXIM. The company stressed that the participation of ENEC was the first collaborative measure following a Memorandum of Understanding signed between Nuclearelectrica and ENEC in March.

The NuScale power module on which the VOYGR nuclear power plants are based is a pressurized water reactor with all the necessary components for steam generation and heat exchange incorporated into a single 77 MWe unit. This is the first SMR model to receive approval from the U.S. Nuclear Regulatory Commission. The company offers a 12-module VOYGR-12 power plant capable of producing 924 MWe, as well as 4-module VOYGR-4 (308 MWe) and 6-module VOYGR-6 (462 MWe) plants and other configurations according to customer needs.

California-based startup Radiant has secured $300mn to build its first factory in Tennessee and prepare for the mass production of miniature nuclear reactors for off-grid applications.
Terra Innovatum has increased its interactions with the Nuclear Regulatory Commission to advance licensing of its SOLO™ micro-modular reactor, despite the partial shutdown of the US federal government.
The US nuclear regulator has extended the operating licences of three Illinois reactors by 20 years, strengthening Constellation's long-term industrial outlook for the Clinton and Dresden sites.
The SATURNE Industrial Chair aims to develop innovative uranium extraction methods, with joint funding from Orano and the National Research Agency over a four-year period.
US-based X-energy has signed a reservation agreement with South Korea's Doosan Enerbility to secure key components for its small modular nuclear reactors.
Niger expands its mining alliances with Uranium One to develop new sites, while the Dasa project continues seeking financing despite clear political backing.
Samsung Heavy Industries has received Approval in Principle for a floating nuclear plant featuring two SMART100 reactors, marking a step toward the commercialisation of offshore small modular reactors.
The Indian government proposes a unified legal framework for nuclear energy, aiming to boost private investment and increase installed capacity to 100 GW by 2047.
Samsung C&T strengthens its presence in modular nuclear energy in Europe by signing an agreement with Synthos Green Energy to develop up to 24 SMRs in Poland and several Central European countries.
Israeli firm nT-Tao and Ben-Gurion University have developed a nonlinear control system that improves energy stability in fusion plasmas, strengthening the technical foundation of their future compact reactors.
The Indian government has introduced a bill allowing private companies to build and operate nuclear power plants, ending a state monopoly in place for over five decades.
Natura Resources enters a new regulatory phase for its molten salt reactor MSR-1, following the signing of a framework agreement with the US Department of Energy under the Reactor Pilot Program.
Norwegian Nuclear Decommissioning is surveying 22 localities to assess their interest in hosting storage facilities for radioactive waste from the country’s former research reactors.
GE Vernova Hitachi’s BWRX-300 small modular reactor has passed a key regulatory hurdle in the United Kingdom, opening the door to potential commercial deployment, despite no current plans for construction.
Molten salt reactor developer Natura Resources has acquired Shepherd Power and partnered with NOV to scale up modular reactor manufacturing by the next decade.
China National Nuclear Corporation expects commercial operation in 2026 for its ACP100 reactor, following successful cold testing and completion of critical structures in 2025.
Start-up SEATOM has been selected to join NATO's DIANA programme with its micro nuclear reactor designed for extreme environments, reinforcing its position in dual-use marine and military energy technologies.
The Estonian Ministry of Economic Affairs has opened a tender to select a site and conduct initial environmental studies for a 600 MW nuclear power plant, marking a decisive step for the country’s energy future.
The European Commission has approved Poland's financial support plan for its first nuclear power plant, a €42bn project backed by public funding, state guarantees, and a contract for difference mechanism.
Six European nuclear authorities have completed the second phase of a joint review of the Nuward modular reactor, a key step toward aligning regulatory frameworks for small nuclear reactors across Europe.

All the latest energy news, all the time

Annual subscription

8.25€/month*

*billed annually at 99€/year for the first year then 149,00€/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2€/month*
then 14.90€ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.