IberBlue Wind, “La Pinta”: A revolutionary offshore wind energy project in Andalusia

IberBlue Wind unveils the La Pinta project, a revolutionary offshore wind farm off the coast of Granada and Almeria, aimed at harnessing the region's abundant wind resources and generating carbon-free energy through floating offshore turbines.

Share:

Gain full professional access to energynews.pro from 4.90$/month.
Designed for decision-makers, with no long-term commitment.

Over 30,000 articles published since 2021.
150 new market analyses every week to decode global energy trends.

Monthly Digital PRO PASS

Immediate Access
4.90$/month*

No commitment – cancel anytime, activation in 2 minutes.

*Special launch offer: 1st month at the indicated price, then 14.90 $/month, no long-term commitment.

Annual Digital PRO Pass

Full Annual Access
99$/year*

To access all of energynews.pro without any limits

*Introductory annual price for year one, automatically renewed at 149.00 $/year from the second year.

IberBlue Wind, a joint venture between Simply Blue Group, Proes Consultores and FF New Energy Ventures, recently unveiled an ambitious offshore wind energy project off the coast of Granada and Almeria. Known as “La Pinta”, this revolutionary initiative pays tribute to one of Christopher Columbus’ caravels, symbolizing the spirit of exploration and innovation that drives this company. The project aims to harness the region’s abundant wind resources and generate carbon-free energy through advanced offshore floating wind technology.

IberBlue Wind launches La Pinta project: a giant step towards renewable energy

Covering a vast area of approximately 316 square kilometers, La Pinta will house up to 55 wind turbines with an impressive installed capacity of approximately 990 megawatts (MW). Each wind turbine will have a capacity of 18 MW, allowing for significant energy production. To minimize the visual impact, the wind farm will be located between 15 and 35 kilometers from the coast. Once operational, La Pinta has the potential to power more than 670,000 homes, making a significant contribution to the region’s energy needs.

In line with the Spanish government’s vision to achieve 1-3 gigawatts (GW) of installed offshore wind energy by 2030, IberBlue Wind has submitted the Initial Project Document (IPD), detailing the technical specifications for La Pinta, to the Ministry of Ecological Transition and Demographic Challenge (MITECO). By using innovative offshore floating wind technology, the project aligns with the government’s commitment to promote sustainable and renewable energy sources.

The realization of La Pinta will require a significant global investment of more than 2,500 million euros. However, this venture will not only have a positive environmental impact, but will also generate significant economic and social benefits for the region. The construction and maintenance of the wind farm is expected to create more than 3,300 jobs, boosting the local economy and providing employment opportunities for coastal communities.

Julio Vera, the director of stakeholder engagement and policy at IberBlue Wind, highlighted the importance of Andalusia as a prime location for offshore wind energy development in Spain. With its abundant wind resources and favorable infrastructure, the region has the potential to become a reference for future offshore wind projects. However, the integration of these wind farms into the existing environment requires the collaboration of various stakeholders, including the Junta de Andalucía, city councils, associations and representative bodies of the region. IberBlue Wind is committed to building strong partnerships and ensuring the successful integration of its projects into the local community.

The offshore energy revolution: IberBlue Wind and its projects in Andalusia

La Pinta is the second offshore wind farm that IberBlue Wind is developing in Andalusia. Last November, the joint venture announced the Nao Victoria project in the Alboran Sea, off the coasts of Malaga and Cadiz, with a similar installed capacity of approximately 990 MW. In addition, IberBlue Wind has proposed three other projects: Botafogo, the first offshore wind farm in Portugal off Figueira da Foz, as well as the pioneering cross-border offshore wind projects called Juan Sebastián Elcano and Creoula, located between Spain and Portugal. Together, these projects aim to achieve a combined installed capacity of approximately 1.96 GW.

While IberBlue Wind remains committed to the development of offshore wind energy, the company’s vision aligns with Spain and Portugal’s broader goals of leading the renewable energy revolution. By harnessing the immense wind resources available offshore, IberBlue Wind aims to generate clean, reliable and economically viable electricity, thereby gradually reducing dependence on fossil fuels and mitigating the impact of climate change.

Thus, IberBlue Wind’s La Pinta project represents an important step in the development of offshore wind energy in Spain. Tapping into the abundant resources of the Granada and Almeria region, this revolutionary wind farm will make a significant contribution to carbon-free energy production through state-of-the-art offshore floating wind turbine technology. Through strong partnerships and successful integration into the community, IberBlue Wind is committed to continuing its development of offshore wind farms, contributing to the transition to a sustainable energy future.

Vattenfall commits new investment to the Clashindarroch II onshore wind project, a 63MW site in Scotland set to begin construction in 2026 and deliver first power in 2027.
Alerion Clean Power enters the Irish market through the acquisition of an onshore wind farm in County Tipperary, as part of its 2025–2028 industrial plan.
Driven by China's acceleration, global wind capacity is expected to reach 170 GW in 2025, paving the way for a doubling of installed capacity by 2032.
Ocean Winds reaches a new milestone with the installation of the first foundation at the Dieppe – Le Tréport offshore wind farm, which will comprise 62 turbines supplying nearly 850,000 people.
Pennavel and BrestPort strengthen their partnership around the South Brittany floating wind project, aiming to structure industrial operations from 2030 at the EMR terminal of the port of Brest.
Van Oord has completed the installation of 109 inter-array cables at the Sofia offshore wind farm, marking a major logistical milestone for this North Sea energy infrastructure project.
Italian producer ERG will supply 1.2 TWh of energy to Rete Ferroviaria Italiana starting in October, marking a step forward in structuring the national PPA market.
The Chinese turbine manufacturer has signed a strategic agreement with Mensis Enerji to develop an initial 4.5 GW wind power portfolio in Turkey, strengthening its position in a fast-growing regional market.
The Trump administration plans to revoke federal approval of the New England Wind project, jeopardising offshore wind contracts representing 2,600 MW of capacity off the northeastern US coast.
Orsted and two U.S. states have taken federal legal action to contest the abrupt halt of the Revolution Wind project, a $5 billion offshore venture now at risk of prolonged suspension.
SPIE Wind Connect will carry out subsea connections for phase II of the TPC project, a major development in Taiwan’s offshore wind sector with a projected annual capacity of 1,000 GWh.
Envision Energy launches its first project in Turkey in partnership with Yildizlar Group, adding 232 MW to the national wind capacity in Karaman province.
ABO Energy maintains its annual targets despite a drop in half-year profit, relying on cost-cutting measures and early project sales to secure cash flow.
Energiekontor has closed financing for two wind projects in Verden, with a combined 94 MW, with construction starting this year and commissioning scheduled for 2027.
South Korea has rejected all projects using foreign turbines in its 2025 offshore wind auction, marking a strategic shift in favour of local industry and energy security.
The Danish Energy Agency confirmed the rejection of 37 feasibility study permit applications, citing European Union state aid rules and lack of competition.
With an AUD$3 billion investment, ACEN launches one of Tasmania’s largest private projects, aiming for commissioning in 2030 and annual supply for 500,000 households.
In France, a 12.9 MW wind farm financed by local actors has been commissioned in Martigné-Ferchaud, showcasing an unprecedented model of shared governance between citizens, local authorities and public investment companies.
The governors of five states urged the Trump administration to maintain permits for threatened offshore wind projects, citing massive investments and jobs at stake in a nascent industry.
Green Wind Renewables is developing a 450 MW wind farm in the Wheatbelt region of Australia, with up to 75 turbines and an estimated annual output of 1.5 TWh.

Log in to read this article

You'll also have access to a selection of our best content.