NuScale in talks with the Philippines on SMR deployment

Last May 1, a meeting was held in Washington between Philippine officials and NuScale officials to discuss a nuclear power plant project. This ambitious, multi-billion dollar project aims to provide 462 MW to the Philippines by the early 2030s with NuScale's innovative technology.

Share:

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25€/month*

*billed annually at 99€/year for the first year then 149,00€/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2€/month*
then 14.90€ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

President Marcos of the Philippines, accompanied by Filipino leaders, met with NuScale in Washington DC on May 1. This meeting followed preliminary discussions that took place last September in New York, on the sidelines of Marcos’ participation in the United Nations General Assembly. Prime Infra estimates that the future value of the project investment will be between $6.5 billion and $7.5 billion, providing 462 MW to the country by the early 2030s.

NuScale Power Module, first SMR project validated by the United States

The NuScale power module is a pressurized water reactor (PWR) that integrates all steam generation and heat exchange components into a single unit, producing 77 MWe. In September 2020, the NuScale Power Module became the first small modular reactor (SMR) project to receive approval from the U.S. Nuclear Regulatory Commission.

NuScale offers its units as VOYGR power plants: a VOYGR-12 power plant with 12 modules can produce 924 MWe. The company also offers four- and six-module power plants and other configurations according to customer needs. NuScale is currently working with partners in the United States, Romania, Indonesia and Poland on projects to deploy its SMRs.

The Bataan power plant, a failure for the Philippines

In response to the 1973 oil crisis, the Philippines decided to build the two-unit Bataan power plant. Construction of Bataan 1, a 621 MWe PWR from Westinghouse, began in 1976 and was completed in 1984 at a cost of $460 million. However, due to financial problems and earthquake safety concerns, the plant was never fueled or operated. Since then, it has been regularly maintained.

In March 2022, President Rodrigo Duterte signed a presidential decree that outlined the government’s position for the inclusion of nuclear power in the Philippines’ energy mix, taking into account economic, political, social, and environmental objectives. President Marcos included nuclear power among his campaign promises before winning the election last May.

Videberg Kraft AB becomes the first company to request government support to build two new reactors at the Ringhals site, under the national nuclear investment framework adopted in 2025.
The European Commission opens an in-depth investigation into Prague's public funding of a major nuclear project, which could reach €30bn ($32.88bn), with guaranteed revenues over forty years.
Niigata's assembly officially backs the restart of the Kashiwazaki-Kariwa site, marking a key step in Japan’s return to nuclear energy following the 2011 Fukushima disaster.
The Japanese government plans to fund up to 30% of loans required for nuclear projects, aiming to accelerate reactor restarts and double the share of nuclear energy in its energy mix by 2040.
French nuclear reactor developer Newcleo has submitted its lead-cooled small modular reactor design to Euratom, initiating the first regulatory phase to integrate nuclear non-proliferation safeguards at the European level.
US-based Holtec has signed a memorandum of understanding with Hungary’s energy group MVM to assess the deployment of its SMR-300 technology, strengthening bilateral nuclear cooperation and opening prospects for a new market in Central Europe.
California-based startup Radiant has secured $300mn to build its first factory in Tennessee and prepare for the mass production of miniature nuclear reactors for off-grid applications.
Terra Innovatum has increased its interactions with the Nuclear Regulatory Commission to advance licensing of its SOLO™ micro-modular reactor, despite the partial shutdown of the US federal government.
The US nuclear regulator has extended the operating licences of three Illinois reactors by 20 years, strengthening Constellation's long-term industrial outlook for the Clinton and Dresden sites.
The SATURNE Industrial Chair aims to develop innovative uranium extraction methods, with joint funding from Orano and the National Research Agency over a four-year period.
US-based X-energy has signed a reservation agreement with South Korea's Doosan Enerbility to secure key components for its small modular nuclear reactors.
Niger expands its mining alliances with Uranium One to develop new sites, while the Dasa project continues seeking financing despite clear political backing.
Samsung Heavy Industries has received Approval in Principle for a floating nuclear plant featuring two SMART100 reactors, marking a step toward the commercialisation of offshore small modular reactors.
The Indian government proposes a unified legal framework for nuclear energy, aiming to boost private investment and increase installed capacity to 100 GW by 2047.
Samsung C&T strengthens its presence in modular nuclear energy in Europe by signing an agreement with Synthos Green Energy to develop up to 24 SMRs in Poland and several Central European countries.
Israeli firm nT-Tao and Ben-Gurion University have developed a nonlinear control system that improves energy stability in fusion plasmas, strengthening the technical foundation of their future compact reactors.
The Indian government has introduced a bill allowing private companies to build and operate nuclear power plants, ending a state monopoly in place for over five decades.
Natura Resources enters a new regulatory phase for its molten salt reactor MSR-1, following the signing of a framework agreement with the US Department of Energy under the Reactor Pilot Program.
Norwegian Nuclear Decommissioning is surveying 22 localities to assess their interest in hosting storage facilities for radioactive waste from the country’s former research reactors.
Electricité de France's Flamanville 3 reactor has reached full power for the first time, marking a key industrial milestone in the deployment of EPRs in Europe, despite cost overruns reaching EUR23.7bn ($25.7bn).

All the latest energy news, all the time

Annual subscription

8.25€/month*

*billed annually at 99€/year for the first year then 149,00€/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2€/month*
then 14.90€ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.