France: EDF’s new anti-corrosion plan validated by the ASN

EDF's revised plan to inspect and repair welds in its nuclear reactors has been deemed "appropriate" by the French nuclear safety authority. The new plan calls for increased verification of repaired welds.

Share:

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

The timetable presented by EDF to control the welds at risk of cracking in its nuclear reactors, presented in mid-March, has been judged “appropriate” by the Nuclear Safety Authority (ASN), according to press releases from both entities.

The black series for the electric utility had begun in October 2021 with the discovery of a micro-crack in one of its newest and most powerful plants, a phenomenon known as “stress corrosion.” EDF had been forced to launch a major inspection and repair plan, revised last December, which led to the shutdown of many reactors in the midst of the energy crisis.

But EDF had to revise its control program after the discovery of a new crack, very important, in a pipe of the reactor number one of the plant of Penly, in Seine-Maritime (west). In mid-March, the electric utility submitted its new battle plan to the ASN.

“In mid-March, the ASN took note of this amended strategy, which includes a reinforcement of controls on repaired welds, while requesting that technical dialogue continue, in order to ensure the relevance of the schedule envisaged for controls on priority welds,” the ASN said in a statement published Tuesday. “Following these exchanges, ASN considers this schedule to be appropriate,” she said.

On Wednesday morning, EDF welcomed in a press release the fact that the ASN “has indicated that it considers the planned schedule for checks on priority welds to be appropriate”. “To date, the estimate of nuclear production in France for 2023 remains in the range 300-330 TWh,” the group said. The ASN points out that according to this schedule, “90% of repaired welds identified as priorities by EDF because of their repair conditions will be inspected before the end of 2023, and all of these welds will be inspected by the first quarter of 2024. The Authority specifies that the “technical exchanges” with EDF “focused more particularly on the reactors with (…) welds whose inspection is considered a priority”, i.e. reactor 1 at the Nogent-sur-Seine plant and reactor 2 at the Cruas plant. Operating measures will be implemented” on these two reactors “until their scheduled shutdowns in September 2023”.

Videberg Kraft AB becomes the first company to request government support to build two new reactors at the Ringhals site, under the national nuclear investment framework adopted in 2025.
The European Commission opens an in-depth investigation into Prague's public funding of a major nuclear project, which could reach €30bn ($32.88bn), with guaranteed revenues over forty years.
Niigata's assembly officially backs the restart of the Kashiwazaki-Kariwa site, marking a key step in Japan’s return to nuclear energy following the 2011 Fukushima disaster.
The Japanese government plans to fund up to 30% of loans required for nuclear projects, aiming to accelerate reactor restarts and double the share of nuclear energy in its energy mix by 2040.
French nuclear reactor developer Newcleo has submitted its lead-cooled small modular reactor design to Euratom, initiating the first regulatory phase to integrate nuclear non-proliferation safeguards at the European level.
US-based Holtec has signed a memorandum of understanding with Hungary’s energy group MVM to assess the deployment of its SMR-300 technology, strengthening bilateral nuclear cooperation and opening prospects for a new market in Central Europe.
California-based startup Radiant has secured $300mn to build its first factory in Tennessee and prepare for the mass production of miniature nuclear reactors for off-grid applications.
Terra Innovatum has increased its interactions with the Nuclear Regulatory Commission to advance licensing of its SOLO™ micro-modular reactor, despite the partial shutdown of the US federal government.
The US nuclear regulator has extended the operating licences of three Illinois reactors by 20 years, strengthening Constellation's long-term industrial outlook for the Clinton and Dresden sites.
The SATURNE Industrial Chair aims to develop innovative uranium extraction methods, with joint funding from Orano and the National Research Agency over a four-year period.
US-based X-energy has signed a reservation agreement with South Korea's Doosan Enerbility to secure key components for its small modular nuclear reactors.
Niger expands its mining alliances with Uranium One to develop new sites, while the Dasa project continues seeking financing despite clear political backing.
Samsung Heavy Industries has received Approval in Principle for a floating nuclear plant featuring two SMART100 reactors, marking a step toward the commercialisation of offshore small modular reactors.
The Indian government proposes a unified legal framework for nuclear energy, aiming to boost private investment and increase installed capacity to 100 GW by 2047.
Samsung C&T strengthens its presence in modular nuclear energy in Europe by signing an agreement with Synthos Green Energy to develop up to 24 SMRs in Poland and several Central European countries.
Israeli firm nT-Tao and Ben-Gurion University have developed a nonlinear control system that improves energy stability in fusion plasmas, strengthening the technical foundation of their future compact reactors.
The Indian government has introduced a bill allowing private companies to build and operate nuclear power plants, ending a state monopoly in place for over five decades.
Natura Resources enters a new regulatory phase for its molten salt reactor MSR-1, following the signing of a framework agreement with the US Department of Energy under the Reactor Pilot Program.
Norwegian Nuclear Decommissioning is surveying 22 localities to assess their interest in hosting storage facilities for radioactive waste from the country’s former research reactors.
Electricité de France's Flamanville 3 reactor has reached full power for the first time, marking a key industrial milestone in the deployment of EPRs in Europe, despite cost overruns reaching EUR23.7bn ($25.7bn).

All the latest energy news, all the time

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.