popular articles

France: Incident during a test at the Civaux power plant, which is due to restart in January

A leak presented as not serious occurred during a hydraulic test on a reactor at the Civaux nuclear power plant (Vienne).

Please share:

A leak presented as not serious was declared during a hydraulic test on a reactor of the nuclear power station of Civaux (Vienne), currently stopped, confirmed Tuesday EDF, without saying if the incident will delay its restarting this winter.

This was revealed in the press, while a meeting of the local information commission on the site is to be held in the afternoon.

The group gave no indication of the time required for the repair, nor of a possible postponement of the return to operation of the affected reactor, scheduled for January 8.

It is “far too early” to say that the timetable will be shifted, said Régis Clément, deputy director of the group’s Nuclear Generation Division, during a press briefing on the “stress corrosion” phenomenon affecting EDF reactors, including those at Civaux.

The incident that occurred on November 2 has nothing to do with this problem, according to the leader: “it is absolutely not a weld that broke”, he said.

The two reactors of the Vienne power plant are the most recent and most powerful of the French fleet at the moment, with a power of 1.45 GW each. The leak concerns the number one reactor, launched in December 1997 and shut down since August 2021.

It occurred during a “hydraulic test” to check the tightness of the “primary circuit” (the one that cools the reactor core) as part of a “regulatory control” carried out “every ten years”, in the absence of nuclear fuel in the tank, said Clement.

A specific device for this test did not resist the increase in pressure and its rupture, the first of its kind according to EDF, caused a jet of steam, which flooded a room by turning into water.

The leak is of the order of 1.5 cubic meters per hour and “80 m3 of effluent” have been recovered, according to the group’s manager.

The latter must now bring a robot into the room to recover a metal element, ejected during the incident and radioactive.

“There is no risk to the environment, nor to public health,” assured the deputy director general of the Institute for Radiation Protection and Nuclear Safety (IRSN), Karine Herviou, on franceinfo.

Once the repair is done, “the interrupted requalification test will have to be resumed,” a spokeswoman for the Nuclear Safety Authority told AFP.

Stress corrosion repairs have been completed on Civaux 1. They are underway on reactor No. 2, which is scheduled to restart on January 14.

Register free of charge for uninterrupted access.

Publicite

Recently published in

Czech justice has suspended the signing of a major contract between Prague and South Korea’s KHNP, following a complaint by French group EDF challenging the fairness of the Dukovany nuclear project tender.
Thanks to recent strategic agreements, Utah is establishing itself as a key regional hub for the development and production of Small Modular Reactors, boosting a rapidly growing industry at the heart of the United States.
Thanks to recent strategic agreements, Utah is establishing itself as a key regional hub for the development and production of Small Modular Reactors, boosting a rapidly growing industry at the heart of the United States.
The United States is multiplying energy agreements with Romania and Bulgaria, focusing on civil nuclear power and hydropower storage to deepen its influence in strategic regional projects.
The United States is multiplying energy agreements with Romania and Bulgaria, focusing on civil nuclear power and hydropower storage to deepen its influence in strategic regional projects.
U.S.-based Energy Fuels extracted 151,400 pounds of uranium in April, reaching an unprecedented level since the opening of its Pinyon Plain mine, while underground drilling reveals exceptionally high grades.
U.S.-based Energy Fuels extracted 151,400 pounds of uranium in April, reaching an unprecedented level since the opening of its Pinyon Plain mine, while underground drilling reveals exceptionally high grades.
The Nuclear Safety and Radiation Protection Authority (ASNR) will now publish its decisions and expert reports simultaneously, amid a controversial merger of nuclear oversight bodies.
The French Parliament has approved Bernard Fontana's appointment as CEO of EDF, paving the way for a new industrial phase in the nuclear sector under close scrutiny from public and industrial stakeholders.
The French Parliament has approved Bernard Fontana's appointment as CEO of EDF, paving the way for a new industrial phase in the nuclear sector under close scrutiny from public and industrial stakeholders.
Polskie Elektrownie Jądrowe signed a new agreement with the Westinghouse-Bechtel consortium to ensure the continuity of the development of Poland’s first nuclear power plant project.
Polskie Elektrownie Jądrowe signed a new agreement with the Westinghouse-Bechtel consortium to ensure the continuity of the development of Poland’s first nuclear power plant project.
Two French MPs have raised concerns over the massive cost overruns of the Hinkley Point nuclear project, describing it as a “financial sinkhole” for EDF, now fully owned by the State.
Two French MPs have raised concerns over the massive cost overruns of the Hinkley Point nuclear project, describing it as a “financial sinkhole” for EDF, now fully owned by the State.
The Chinese State Council has just authorized the construction of ten new nuclear reactors across five strategic sites, highlighting a massive acceleration in energy ambitions to achieve record installed capacity by 2025.
Axpo reconnected unit 1 of the Beznau nuclear power plant to the grid after two weeks of refuelling, marking the start of a new operating cycle for the Swiss facility.
Axpo reconnected unit 1 of the Beznau nuclear power plant to the grid after two weeks of refuelling, marking the start of a new operating cycle for the Swiss facility.
The Czech competition regulator has dismissed EDF’s appeal, confirming the selection of Korea Hydro & Nuclear Power for the construction of new nuclear capacity at Dukovany.
The Czech competition regulator has dismissed EDF’s appeal, confirming the selection of Korea Hydro & Nuclear Power for the construction of new nuclear capacity at Dukovany.
Trondheimsleia Kjernekraft AS was founded to lead a nuclear plant project based on several small modular reactors in the Trøndelag region, targeting up to 1500 MWe of installed capacity.
Trondheimsleia Kjernekraft AS was founded to lead a nuclear plant project based on several small modular reactors in the Trøndelag region, targeting up to 1500 MWe of installed capacity.
Flamanville’s EPR nuclear reactor experienced a temporary shutdown on Friday and Saturday, without affecting its ramp-up schedule, EDF confirmed.
Japanese operator Tepco has completed the extraction of a second radioactive debris sample from the damaged Fukushima reactor, a critical technical step in a decommissioning project set to span several decades.
Japanese operator Tepco has completed the extraction of a second radioactive debris sample from the damaged Fukushima reactor, a critical technical step in a decommissioning project set to span several decades.
US-based enCore Energy continues to optimise its uranium project in Texas with a record installation rate and strengthened leadership team.
US-based enCore Energy continues to optimise its uranium project in Texas with a record installation rate and strengthened leadership team.
Framatome has commissioned a new facility in Romans-sur-Isère to secure long-term production of research reactor fuels and medical isotopes.
Framatome has commissioned a new facility in Romans-sur-Isère to secure long-term production of research reactor fuels and medical isotopes.
EDF reconnected the Flamanville EPR nuclear reactor to the power grid on 19 April, two days ahead of schedule, following a series of technical maintenance works and adjustments on critical components.
TerraPower has informed the UK regulator of its intention to submit the Natrium reactor design for evaluation under the Generic Design Assessment (GDA) process, the first step toward international deployment of this nuclear technology.
TerraPower has informed the UK regulator of its intention to submit the Natrium reactor design for evaluation under the Generic Design Assessment (GDA) process, the first step toward international deployment of this nuclear technology.
Framatome and Sizewell C have signed a contract for the supply, qualification, and pre-assembly of conventional instrumentation for the EPR reactors under construction at Sizewell, strengthening their collaboration on this large-scale project.
Framatome and Sizewell C have signed a contract for the supply, qualification, and pre-assembly of conventional instrumentation for the EPR reactors under construction at Sizewell, strengthening their collaboration on this large-scale project.
Uzbekistan has launched the construction of auxiliary buildings for its future modular nuclear reactor, the first export project for the Russian RITM-200N technology.
Uzbekistan has launched the construction of auxiliary buildings for its future modular nuclear reactor, the first export project for the Russian RITM-200N technology.
The restart of the Flamanville EPR reactor, initially scheduled for 17 April, has now been postponed to 21 April following extended maintenance operations, according to a statement from Électricité de France.
EDF announced on April 10 the extension of the shutdown of the Flamanville EPR nuclear reactor, initially scheduled to restart on April 12, due to new maintenance operations within its nuclear zone.
EDF announced on April 10 the extension of the shutdown of the Flamanville EPR nuclear reactor, initially scheduled to restart on April 12, due to new maintenance operations within its nuclear zone.
The French National Assembly has launched a mission to analyse nuclear pricing and anticipate the effects of the 2026 tariff reform amid heightened tensions over energy costs.
The French National Assembly has launched a mission to analyse nuclear pricing and anticipate the effects of the 2026 tariff reform amid heightened tensions over energy costs.
GE Hitachi and Rolls-Royce SMR have submitted their final offer as part of the modular reactor selection process led by Great British Nuclear in the United Kingdom.
GE Hitachi and Rolls-Royce SMR have submitted their final offer as part of the modular reactor selection process led by Great British Nuclear in the United Kingdom.

Advertising