EDF Promises to Reopen Nuclear Power Plants

The 26 French nuclear reactors currently shut down should have restarted their electricity production during the winter.

Share:

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

The 26 French nuclear reactors currently shut down should have restarted their electricity production during the winter, announced Wednesday the management of EDF, under pressure as a tense season approaches on the energy security front.

France is facing an exceptional unavailability of its 56 reactors: the “effective” holding of this schedule of return to the network will play a key role in the management of electricity this winter, warned Wednesday RTE, the network manager.

This situation is due to the delay of the ten-yearly maintenance due to Covid and the discovery of corrosion problems last winter, forcing EDF to undertake a general inspection.

Wednesday before the MPs, EDF CEO Jean-Bernard Lévy said that “the sites related to corrosion were progressing at a good pace: Tricastin 1, the first, is completed.

Regarding the restart of the 26 reactors currently shut down, five should restart in September, five in October, followed by seven more in November, three in December, three in January and two in February, said Cedric Lewandowski, Executive Director of EDF.

A 26th one is currently in “accidental” shutdown and should be restarted shortly. “To date, 27 reactors are connected to the grid and three are in fuel economy so that they can produce next winter,” according to Lévy.

However, he stressed the “lack of room for maneuver in the sector to absorb (more quickly) this unexpected increase in workload”, especially in the most advanced operations.

“Our teams and those of our industrial partners are fully mobilized to put back on the network the maximum number of reactors possible for the next winter,” he said, adding that the group now had “a means of non-destructive testing” to continue corrosion diagnostics.

But “we are facing an unexpected accumulation of activities, which mobilizes specialized and rare skills, pipe fitters, welders, tapers, boilermakers … This skills gap affects our ability to repair at the rate we would like,” he said.

The boss of EDF, whose successor will be announced shortly, took the opportunity to return to his recent comments critical of the State’s strategy on nuclear power, comments deemed “unacceptable” by Emmanuel Macron.

Wednesday he insisted on the impact of Fukushima and on “the political context of 2012″, then favorable to a nuclear exit. Today “the positive momentum (in favor of nuclear, Editor’s note) is reignited, with the speech of Belfort in particular, but it will take time, it is the industrial time,” he said.

“If, ten years ago, we had been able to launch two or three reactor projects, we could have had them,” he says. After having planned to reduce the nuclear power, a decision made in a 2015 law, France has chosen to revive the atom, through the voice of Emmanuel Macron, who in Belfort in February wanted the construction of six new EPR-type reactors.

French nuclear reactor developer Newcleo has submitted its lead-cooled small modular reactor design to Euratom, initiating the first regulatory phase to integrate nuclear non-proliferation safeguards at the European level.
French state utility EDF has increased the maximum estimated cost for building six new nuclear reactors to €72.8 billion ($85.29 billion), representing a 40% rise over the original figure.
US-based Holtec has signed a memorandum of understanding with Hungary’s energy group MVM to assess the deployment of its SMR-300 technology, strengthening bilateral nuclear cooperation and opening prospects for a new market in Central Europe.
California-based startup Radiant has secured $300mn to build its first factory in Tennessee and prepare for the mass production of miniature nuclear reactors for off-grid applications.
Terra Innovatum has increased its interactions with the Nuclear Regulatory Commission to advance licensing of its SOLO™ micro-modular reactor, despite the partial shutdown of the US federal government.
The US nuclear regulator has extended the operating licences of three Illinois reactors by 20 years, strengthening Constellation's long-term industrial outlook for the Clinton and Dresden sites.
The SATURNE Industrial Chair aims to develop innovative uranium extraction methods, with joint funding from Orano and the National Research Agency over a four-year period.
US-based X-energy has signed a reservation agreement with South Korea's Doosan Enerbility to secure key components for its small modular nuclear reactors.
Niger expands its mining alliances with Uranium One to develop new sites, while the Dasa project continues seeking financing despite clear political backing.
Samsung Heavy Industries has received Approval in Principle for a floating nuclear plant featuring two SMART100 reactors, marking a step toward the commercialisation of offshore small modular reactors.
The Indian government proposes a unified legal framework for nuclear energy, aiming to boost private investment and increase installed capacity to 100 GW by 2047.
Samsung C&T strengthens its presence in modular nuclear energy in Europe by signing an agreement with Synthos Green Energy to develop up to 24 SMRs in Poland and several Central European countries.
Israeli firm nT-Tao and Ben-Gurion University have developed a nonlinear control system that improves energy stability in fusion plasmas, strengthening the technical foundation of their future compact reactors.
The Indian government has introduced a bill allowing private companies to build and operate nuclear power plants, ending a state monopoly in place for over five decades.
Natura Resources enters a new regulatory phase for its molten salt reactor MSR-1, following the signing of a framework agreement with the US Department of Energy under the Reactor Pilot Program.
Norwegian Nuclear Decommissioning is surveying 22 localities to assess their interest in hosting storage facilities for radioactive waste from the country’s former research reactors.
Electricité de France's Flamanville 3 reactor has reached full power for the first time, marking a key industrial milestone in the deployment of EPRs in Europe, despite cost overruns reaching EUR23.7bn ($25.7bn).
GE Vernova Hitachi’s BWRX-300 small modular reactor has passed a key regulatory hurdle in the United Kingdom, opening the door to potential commercial deployment, despite no current plans for construction.
Molten salt reactor developer Natura Resources has acquired Shepherd Power and partnered with NOV to scale up modular reactor manufacturing by the next decade.
China National Nuclear Corporation expects commercial operation in 2026 for its ACP100 reactor, following successful cold testing and completion of critical structures in 2025.

All the latest energy news, all the time

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.