Greater Gabbard celebrates its 10th anniversary

The Greater Gabbard offshore wind farm celebrates its 10th anniversary. Following its success, an extension, North Falls Offshore Wind Farm is planned.

Share:

Gain full professional access to energynews.pro from 4.90$/month.
Designed for decision-makers, with no long-term commitment.

Over 30,000 articles published since 2021.
150 new market analyses every week to decode global energy trends.

Monthly Digital PRO PASS

Immediate Access
4.90$/month*

No commitment – cancel anytime, activation in 2 minutes.

*Special launch offer: 1st month at the indicated price, then 14.90 $/month, no long-term commitment.

Annual Digital PRO Pass

Full Annual Access
99$/year*

To access all of energynews.pro without any limits

*Introductory annual price for year one, automatically renewed at 149.00 $/year from the second year.

Greater Gabbard wind farm celebrates its 10th anniversary. Operational since September 2012, it is located 20km off the Suffolk coast in eastern England.

Greater Gabbard Wind Farm

It is the result of a joint venture between the German company RWE Renewables and the Scottish company SSE Renawables. This 504 MW park, composed of 140 turbines, has produced more than 17,487 GWh during its 10 years of operation. In addition, this energy supplied 400,000 British homes each year.

Thus, its existence has allowed and will continue to allow a significant reduction in British carbon dioxide emissions.

Glynn Fereday, Director of Operations for Greater Gabbard, states:

“The wind farm was a pioneering project for the UK offshore wind industry and for many years the 140-turbine site was the largest wind farm under development in the world.”

Towards an extension of the park?

Faced with a severe energy and economic crisis, the United Kingdom needs more than ever to develop its clean energy. Thus, the Greater Gabbard offshore wind farm will experience a new phase after its 10 years of existence.

In fact, the success of the park encourages such an expansion. The project is known as North Falls Offshore Wind Farm.

In addition, a lease agreement for up to 504 MW has already been reached by the two companies managing the plant. Greater Gabbard should therefore see its production double in the next few years.

Octopus Energy has signed a strategic agreement with Ming Yang Smart Energy to deploy up to 6 GW of wind projects in the UK, combining software technology and turbines to boost local capacity.
The US government has requested the judicial cancellation of the federal permit granted in 2024 for an offshore wind project, citing impacts on commercial fishing and maritime rescue operations.
Vattenfall commits new investment to the Clashindarroch II onshore wind project, a 63MW site in Scotland set to begin construction in 2026 and deliver first power in 2027.
Alerion Clean Power enters the Irish market through the acquisition of an onshore wind farm in County Tipperary, as part of its 2025–2028 industrial plan.
Driven by China's acceleration, global wind capacity is expected to reach 170 GW in 2025, paving the way for a doubling of installed capacity by 2032.
Ocean Winds reaches a new milestone with the installation of the first foundation at the Dieppe – Le Tréport offshore wind farm, which will comprise 62 turbines supplying nearly 850,000 people.
Pennavel and BrestPort strengthen their partnership around the South Brittany floating wind project, aiming to structure industrial operations from 2030 at the EMR terminal of the port of Brest.
Van Oord has completed the installation of 109 inter-array cables at the Sofia offshore wind farm, marking a major logistical milestone for this North Sea energy infrastructure project.
Italian producer ERG will supply 1.2 TWh of energy to Rete Ferroviaria Italiana starting in October, marking a step forward in structuring the national PPA market.
The Chinese turbine manufacturer has signed a strategic agreement with Mensis Enerji to develop an initial 4.5 GW wind power portfolio in Turkey, strengthening its position in a fast-growing regional market.
The Trump administration plans to revoke federal approval of the New England Wind project, jeopardising offshore wind contracts representing 2,600 MW of capacity off the northeastern US coast.
Orsted and two U.S. states have taken federal legal action to contest the abrupt halt of the Revolution Wind project, a $5 billion offshore venture now at risk of prolonged suspension.
SPIE Wind Connect will carry out subsea connections for phase II of the TPC project, a major development in Taiwan’s offshore wind sector with a projected annual capacity of 1,000 GWh.
Envision Energy launches its first project in Turkey in partnership with Yildizlar Group, adding 232 MW to the national wind capacity in Karaman province.
ABO Energy maintains its annual targets despite a drop in half-year profit, relying on cost-cutting measures and early project sales to secure cash flow.
Energiekontor has closed financing for two wind projects in Verden, with a combined 94 MW, with construction starting this year and commissioning scheduled for 2027.
South Korea has rejected all projects using foreign turbines in its 2025 offshore wind auction, marking a strategic shift in favour of local industry and energy security.
The Danish Energy Agency confirmed the rejection of 37 feasibility study permit applications, citing European Union state aid rules and lack of competition.
With an AUD$3 billion investment, ACEN launches one of Tasmania’s largest private projects, aiming for commissioning in 2030 and annual supply for 500,000 households.
In France, a 12.9 MW wind farm financed by local actors has been commissioned in Martigné-Ferchaud, showcasing an unprecedented model of shared governance between citizens, local authorities and public investment companies.

Log in to read this article

You'll also have access to a selection of our best content.