Terna Energy: Hybrid Renewable Power Plant in Greece

Terna Energy joins forces with CRES to develop a renewable electricity production and storage plant on the island of Agios Efstratios in Greece.

Share:

terra energy grèce

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25€/month*

*billed annually at 99€/year for the first year then 149,00€/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2€/month*
then 14.90€ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

Terna Energy is to develop a renewable electricity generation and storage plant on the island of Agios Efstratios in Greece. The company is partnering with CRES for this operation following a collaboration agreement signed at the end of March 2021.

Terna Energy brings green energy to the island of Agios Efstratios

Collaboration agreement with CRES

“It is with great pleasure that we have signed the agreement to make Agios Efstratios a green island. It’s a project that introduces new technologies to the country. It will effectively combine the production of green energy with its storage and use,” said Terna Energy’s CEO.

As part of the “Hybrid system for electricity and heat production from RES on the island of Agios Efstratios” project, Terna Energy has just signed a collaboration agreement with the Center for Renewable Sources and Energy Savings (CRES). The aim is to develop a hybrid power plant for the use and storage of electricity generated from renewable energies.

agios efstrátios
Location of the Greek island of Agios Efstrátios in the Aegean Sea.

A hybrid storage-generation power plant

The plant will comprise a wind turbine, a photovoltaic station, storage batteries and an energy management and control system.

An integrated district heating system for the Ai Stratis community is also included. It will be equipped with central heat production and storage units.

85% renewable energy for the island’s needs

The aim is to achieve 85% or more penetration of renewable energy sources in the island’s electricity system. As a result, the island community’s heat and hot water needs will be met to the full.

The company has agreed to design, install and commission the hybrid plant. It will also operate and maintain the project for twelve years.

Erex and Samsung C&T announce a partnership to develop grid-scale energy storage projects in Japan. The two companies plan a 50:50 joint venture to deploy large-scale storage installations.
Sinopec and LG Chem announce a strategic partnership to develop key materials for sodium-ion batteries. This collaboration aims to accelerate the commercialization of this technology in energy storage systems and low-speed electric vehicles.
HEINEKEN, EDP, and Rondo Energy are deploying a 100 MWh industrial heat battery in Lisbon, providing renewable steam 24/7 using on-site solar power and the grid.
NextStar Energy begins lithium-ion battery production for energy storage systems (ESS) in its Windsor plant this month, expanding its operations beyond electric vehicle batteries.
Baltic Storage Platform secures a record €85.6mn ($90.6mn) to develop two battery energy storage sites in Estonia, marking the first such financing in the Baltics based solely on storage revenue streams.
Eos Energy and Frontier Power strengthen their collaboration with a major first order under a 5 GWh framework agreement to deploy long-duration storage systems across multiple energy markets.
Asia-based Alternō opens a subsidiary in Japan to industrialise its sand thermal batteries, targeting the agricultural and manufacturing sectors with two new renewable heat storage systems.
Chinese manufacturer Fox ESS has entered into a partnership with Australian distributor Solar Juice to deploy up to 1GWh of battery capacity, targeting the fast-growing residential and commercial segments of the Australian market.
The Arkansas Oil and Gas Commission validated integration of the Reynolds Brine Unit after unitizing 20,854 acres and adopting a 2.5% lithium royalty. The project targets 22,500 tonnes per year of battery-grade lithium carbonate from 2028 via a 55:45 joint venture.
Star Charge Americas has signed a major service agreement with Beneficial Holdings to deploy over 32 GWh of battery energy storage systems in the United States and Puerto Rico, with a total value exceeding $3.2 billion.
Joint venture Baltic Storage Platform has secured €85.6mn ($90.7mn) to build two energy storage systems in Estonia, forming one of continental Europe’s largest battery complexes.
InSolare Energy has secured a 600 MW / 1,200 MWh battery energy storage contract from state-owned SECI, strengthening its position in India’s energy infrastructure market.
Canadian Solar’s subsidiary has completed the commercial operation of a battery storage project in Mannum, marking a key milestone in the large-scale energy deployment in southern Australia.
Daiei Sangyo partners with Truewin Technology and Formosa Japan to develop 100 energy storage sites totalling 800MWh and expand into power-linked data centre operations.
Japanese company AI.net has signed a supply deal with China’s CATL for 1GWh of lithium-ion batteries, marking its entry into large-scale energy storage with a target of 500MW by March 2028.
Canadian group Energy Plug Technologies continues its expansion in the US market with the delivery of a new energy storage system to an industrial client based in the southern region.
Despite the emergence of new storage technologies, lithium-ion batteries retain a dominant position thanks to industrial leadership, improved performance and a high geographic concentration of production capacity.
Envision Energy launches the Gen 8 platform, a modular storage range from 6 to 12 MWh, aiming to optimise energy density, logistical flexibility, and profitability for large-scale projects.
BAK Battery presented in Chongqing its semi-solid batteries ready for industrialisation, with cells reaching up to 390Wh/kg, confirming its strategy focused on scenario-specific adaptation and mass production.
Daiwa Energy & Infrastructure has launched a 38MW grid-scale battery system in Chitose, aiming for commissioning in 2027, as part of its deployment of high-voltage storage assets across Japan.

All the latest energy news, all the time

Annual subscription

8.25€/month*

*billed annually at 99€/year for the first year then 149,00€/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2€/month*
then 14.90€ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.