ASN-IRSN merger desirable in the face of future workloads

Against a backdrop of debate and contestation, the proposed merger of IRSN and ASN is raising questions about its legitimacy and impact on the governance of nuclear safety.

Share:

IRSN

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

A merger of the two institutions responsible for nuclear safety in France is desirable in view of the expected increase in the workload involved in monitoring present and future power plants, the authors of a parliamentary report said on Wednesday. The report, published on Tuesday, recommends merging the Institut de Radioprotection et Sûreté Nucléaire (IRSN), a safety expert, and the Autorité de Sûreté Nucléaire (ASN), responsible for decisions on power plants.

ASN-IRSN Merger: Towards a Simplification of Nuclear Safety Governance

In April, Parliament rejected this reform, which came from the Elysée Palace, amid criticism of the method and concerns about the transparency and quality of expertise. The Senate then commissioned a report from the Office parlementaire des choix scientifiques (Opecst).

“What led us to this recommendation (to merge) is the scale of the work before the decision-making body: the ASN makes over 2,000 decisions a year, of which only 400 come under the IRSN. So there’s a kind of dispersal of expertise,” Senator Stéphane Piednoir, one of the rapporteurs, told the press. “To cope with the coming decades, with the construction of EPR2s, ten-yearly inspections (of existing reactors), plus start-ups involving new technologies, it seems to us that, to improve the speed of decision-making, this is the right solution”, he said, adding that there is “no criticism of the quality of the work of either side”.

His fellow MP Jean-Luc Fugit (Renaissance) believes that new companies entering the sector would see things “more clearly”.

“With new operators, and the rise in power (of new nuclear power), perhaps it’s better to have a single safety organization, a simpler system, what we might call fluidification,” he said, estimating that this would make it possible to “simplify the governance of safety and even its financing”.

ASN-IRSN Merger: Controversial Report Calls for Delicate Reform

The report does not provide any further details on the organization of the new entity, noting “points still to be clarified” (what to do with IRSN’s commercial activities, in defense, etc.). Asked about the risk of destabilizing the system, Mr. Piednoir responds by calling for action to be taken from the start of the school year, “so that the system stabilizes by the beginning of 2025”. To achieve this, we’ll need a bill that can be debated, which can be “a short text” but “under no circumstances within a budgetary text that could be submitted to the 49-3, for example”, said Mr. Piednoir.

Since the announcement of the President’s intentions, IRSN employees, nuclear experts and members of parliament have been up in arms against the planned merger. On Wednesday, IRSN’s trade unions described the report as “partial and biased”, saying that Opecst was “at the service of the government”.

For former minister Barbara Pompili (Renaissance), “after careful reading… NOTHING in the body of the report seriously justifies the recommendation”. “Almost all of the desirable improvements can be made without a merger. So why propose it as a priority?” she tweeted.

Electrabel has entrusted Framatome with upgrading the control system of the Tihange 3 reactor, reinforcing Belgium’s nuclear extension strategy launched in 2023.
Hitachi joins Washington and Tokyo in strategic projects to modernise the US grid and back artificial intelligence expansion through nuclear and electrification investments.
NANO Nuclear restructures its Canadian operations under the name True North Nuclear to accelerate regulatory and industrial development of its KRONOS MMR™ microreactor.
Cameco and Brookfield have signed a strategic agreement with the US government to build new Westinghouse reactors, a project valued at a minimum of $80bn, including an unprecedented public participation mechanism.
Talks are underway between Astana and Helsinki to consider the delivery of Kazakh uranium for Finnish nuclear power plants, amid efforts to diversify energy export markets.
NextEra Energy announces an agreement with Google to restart a nuclear plant in Iowa, with operations expected to resume as early as 2029 and full site ownership secured.
The environmental review of TerraPower’s Natrium project in Wyoming has been completed, paving the way for a construction permit for this advanced nuclear reactor.
Santee Cooper has selected Brookfield Asset Management to lead a feasibility study aimed at completing two unfinished AP1000 reactors, without relying on public funds or raising consumer rates.
Endesa, Iberdrola and Naturgy have officially requested the Spanish government to delay the closure of the Almaraz nuclear power plant, originally scheduled for 2028, reigniting the debate on nuclear power's role in the national energy mix.
The reactor vessel for Unit 1 at Egypt’s El Dabaa nuclear plant has been delivered following a 20-day maritime transport from Saint Petersburg, marking a critical milestone in the country’s energy project.
Ontario Power Generation secures CAD3bn ($2.1bn) in public equity financing to construct four modular reactors at Darlington, aiming to ease private sector entry into next-generation nuclear infrastructure.
French developer Newcleo launches a joint venture with Nextchem through a EUR70 mn contract to design the conventional island of its upcoming 200 MW modular nuclear reactors.
NANO Nuclear strengthens its North American strategy by acquiring Global First Power in Canada, securing regulatory rights for its KRONOS MMR™ project at Chalk River.
South Korea becomes the first country to submit a safeguards technical report to the IAEA for a small modular reactor, setting a precedent for early integration of non-proliferation requirements in nuclear design.
The Environmental Authority criticises the lack of key data on health risks, chemical discharges and construction safety for EDF's two upcoming EPR2 reactors in Seine-Maritime.
Brazil and China have concluded a three-year agreement to secure access to essential radioisotopes for the medical, industrial and scientific sectors, with no financial exchange between the parties.
US-based developer Last Energy will deploy its first domestic microreactor at Texas A&M-RELLIS, marking a strategic step in the advanced modular reactor race.
PGE acquires ZE PAK's stake in the joint venture responsible for developing Poland’s second nuclear site, consolidating a strategic asset within its energy portfolio.
Amazon unveils new visuals of its upcoming nuclear site, marking a key step in its partnership with X-energy to deploy up to 960 MW of modular nuclear capacity in Washington state.
Canadian uranium producer NexGen Energy has completed a A$1bn ($639mn) equity raise split between North American and Australian markets to support the development of its Rook I project.

All the latest energy news, all the time

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.