Waddi wind project secures environmental approval from Australian government

The Australian government has granted environmental approval for the 108 MW Waddi Wind Farm, a Tilt Renewables project with construction costs exceeding $400mn.

Share:

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

The Australian federal government has granted environmental approval for the Waddi Wind Farm project, located approximately 150 kilometres north of Perth in Western Australia. Developed by Tilt Renewables, the site is planned to have an installed capacity of 108 megawatts. This authorisation marks a critical milestone toward the start of construction, with a final investment decision expected in the coming weeks.

Tilt Renewables’ first project in Western Australia

Tilt Renewables, an Australian-owned renewable energy company, confirmed that Waddi will be its first development in Western Australia. According to Chief Executive Officer Anthony Fowler, the federal government’s clearance removes one of the final regulatory barriers ahead of the project’s execution. The company has collaborated with landholders and local communities to refine the proposal and meet environmental expectations associated with the development.

Over $400mn investment and local economic benefits

The total construction cost of the wind farm is estimated to exceed $400mn. The company plans to engage regional suppliers and local businesses in project delivery, potentially stimulating economic activity in the surrounding rural areas. According to technical projections, once operational, the wind farm is expected to power up to 68,000 homes annually.

Next steps and regulatory conditions

The environmental approval includes specific conditions, developed in consultation with local stakeholders, aimed at minimising the project’s ecological footprint. The final investment decision is scheduled to follow this stage, with construction to begin shortly thereafter if all conditions are met. The site forms a strategic part of Tilt Renewables’ geographic expansion efforts.

Faced with market uncertainty in Europe, Siemens Gamesa pauses a planned industrial investment in Esbjerg, highlighting structural difficulties in the offshore wind sector.
Institutional deadlock in France delays tenders and weakens the offshore wind sector, triggering job cuts and major industrial withdrawals from the market.
The Lithuanian energy group has signed a EUR 318 million financing agreement for its 314 MW wind project, the largest in the Baltic states.
German group BayWa r.e. has tasked Enercoop Bretagne with implementing a citizen investment scheme for its planned wind farm in Plouisy, aiming for shared governance and stronger local involvement.
US wind capacity fell in Q2, but developers anticipate a sharp increase by late 2025, with 46 GW of new capacity forecast by 2029 and a peak in 2027.
Engie has signed a renewable electricity supply contract with Apple covering 173 MW of installed capacity in Italy, with commissioning scheduled between 2026 and 2027.
Renova a soumis une méthodologie d’évaluation environnementale pour un projet éolien terrestre de 280MW à Higashidori, renforçant son positionnement sur les technologies renouvelables au Japon.
The joint venture between BP and JERA ends its offshore wind ambitions in the United States, citing an unfavourable economic and regulatory environment for continuing the development of the Beacon Wind project.
With a 300 MW partnership signed with Nadara, Q ENERGY exceeds 1 GW of wind repowering projects in France, reinforcing its position in a market driven by public investment dynamics.
The acquisition of Cosmic Group by FairWind consolidates its position in Australia and marks a strategic expansion into New Zealand and Japan.
Danish manufacturer Vestas has paused construction of its planned facility in Poland, originally set for 2026, citing weaker-than-expected European offshore wind demand.
British operator Equitix has been selected to take over transmission assets of the Neart na Gaoithe offshore wind farm, a £450mn ($547mn) project awarded under Ofgem’s tenth tender round.
Energiequelle GmbH has launched replacement work for old turbines at its Minden-Hahlen site, aiming for long-term structural maintenance with the installation of three new 200-metre machines.
GE Vernova will equip the Ialomiţa wind farm with 42 turbines of 6.1 MW, strengthening its presence in the European onshore wind sector with a 252 MW project in partnership with Greenvolt.
Eversource Energy posts a one-time $75mn charge linked to unforeseen costs in the Revolution Wind project, while tightening its 2025 earnings forecast.
The Renewables Infrastructure Group has signed a ten-year power purchase agreement with Virgin Media O2 for its onshore wind farms in the United Kingdom, ensuring price stability for both parties.
Eight local associations in Normandy and Hauts-de-France will receive a total of €120,000, financed by revenues from three RWE wind farms, to support public-impact projects in 2025.
CWP Europe formalised two major projects in Albania and Montenegro with backing from the European Commission, reinforcing the Balkans’ integration into the European energy market.
Elawan Energy secured two wind power projects totalling 92MW in Romania through a long-term public contract, strengthening its presence in the region with operations scheduled to begin in 2028.
A study conducted in the Gulf of Lion highlights the risk of collisions between migratory birds and floating wind turbine blades, as the region prepares to host 19 additional turbines by 2031.

All the latest energy news, all the time

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.