JSW restarts coal output with two new longwalls in September

Polish state-owned producer JSW confirms its 13.4 million tonnes production target for 2025 thanks to new equipment coming online, despite recent disruptions at multiple sites.

Share:

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

Jastrzębska Spółka Węglowa (JSW), Poland’s leading coking coal producer, expects to reach its annual production target of 13.4 million tonnes in 2025, supported by the commissioning of two new longwalls in September. The state-owned company continues its industrial upgrade programme despite recent operational disruptions.

A new longwall was launched on 2 September at the Budryk site, with reserves estimated at 1.6 million tonnes. A second longwall was activated on 9 September at the Pniówek mine, bringing in an additional 500,000 tonnes. These additions bring the total number of operating longwalls to around twenty, according to a company official attending the Eurocoke summit in Amsterdam. The annual target was set earlier in the year and remains unchanged despite temporary shutdowns caused by technical incidents.

Response to production interruptions

JSW declared force majeure on 16 May following a fire on 7 May at the Budryk mine, which caused an estimated loss of 345,000 tonnes. Another incident in August also slowed operations. These disruptions impacted underground equipment, but restart efforts proceeded as scheduled.

The company operates six coking coal mines producing semi-hard coal with 8% to 8.5% ash content, 0.7% sulphur, and 24% to 31% volatile matter. A large portion of production is used internally to supply its own coking plants.

Support for national production capacity

JSW produces approximately 3 million tonnes of coke annually, including metallurgical coke, pea coke and nut coke. Maintaining this capacity is essential to supply Poland’s heavy industries, while international market pressure continues to mount.

Coke prices in Europe remain under strain, impacted by high availability from suppliers including Indonesia. In August, imported coke into Europe was priced at $228/tonne CIF at Amsterdam-Rotterdam-Antwerp ports. On 16 September, metallurgical coke 65/63 CSR FOB Indonesia was assessed at $200/tonne, unchanged week-on-week but down $4/tonne month-on-month.

Public investment in the mining sector

JSW, majority-owned by the Polish government, continues to invest in industrial resilience amid a volatile pricing environment. The expansion of production capacity forms part of a broader strategy to support strategic public energy assets. According to a company representative, these efforts aim to ensure continuity of national supply in critical raw materials despite adverse market conditions.

Zimbabwe awards India’s Jindal Steel a $455mn contract to add 400 megawatts, or 20% of national demand, through the rehabilitation of its coal-fired Hwange plant.
Global coal demand is expected to stabilise by the end of the decade as growing competition from other power sources begins to weigh on the market’s long-term outlook.
A new independent study shows that maintaining aging coal plants increases electricity bills in Kentucky, while a renewable-based energy portfolio could generate up to $2.6bn in savings by 2050.
Queensland, Australia's leading coal-producing state, has scrapped its 2035 renewable energy targets, citing competitiveness and energy cost stability as key priorities.
Rising wholesale electricity prices in 2025 are strengthening margins for coal and gas-fired plants in the United States, with the profitability gap between the two narrowing significantly.
New Delhi formalises a 307 GW coal capacity cap by 2035, integrating existing projects without initiating closure policies, within a regulatory framework that remains flexible.
Bangladesh temporarily blocks international arbitration with Adani Power pending the conclusions of an expert committee on the legality of the electricity supply contract signed with the Indian conglomerate.
The European Commission has approved a €1.75 bn ($2.03 bn) public subsidy from Germany to compensate energy company LEAG for the planned shutdown of its coal-fired power plants by 2038.
Seoul joins the Powering Past Coal Alliance and confirms a gradual withdrawal from unabated coal, with a regulatory programme targeting the closure of 40 facilities and a strict assessment of the remaining units.
Indonesia’s coal overproduction has cut state revenues and company profits, while methane emissions from mines far exceed official figures.
The Brazilian government is granting new contracts to coal-fired power plants until 2040, illustrating the weight of regulatory decisions and industrial interests in a country predominantly powered by renewable energy.
New Delhi is preparing a revised roadmap for its climate commitments while maintaining heavy reliance on coal to sustain economic growth and respond to growing regulatory pressure.
J-POWER announces the retirement of its 500MW coal-fired Takasago Thermal Power Station in Hyogo Prefecture by FY2028, marking a key shift in its energy investment strategy.
US coal exports fell 11% in the first half of 2025, prompting the Trump administration to commit $100mn to upgrade domestic power plants and support the national energy sector.
A modelling study finds India does not need new coal plants beyond current plans through 2032, as overcapacity would raise costs and reduce utilisation across the thermal fleet.
Morocco announces a coal exit target for 2040, subject to international support, while accelerating the deployment of renewable energy in its power mix.
Falling Chinese imports and Asia’s regional pivot increase pressure on Australian thermal coal exporters.
Chinese buyers begin negotiations for 2026 thermal coal deliveries, favouring shorter contracts to maintain flexibility in a stable price environment.
Queensland coal producers are struggling to rein in costs, which remain above pre-2022 levels as the impact of royalty hikes and margin pressures continues to weigh on the sector.
Coal will temporarily become the main source of electricity in the Midwest markets MISO and SPP during winter, according to the latest federal forecasts.

All the latest energy news, all the time

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.