EQT signs 20-year deal for 1 Mtpa LNG with Commonwealth LNG

US producer EQT has secured a twenty-year liquefied natural gas supply contract with Commonwealth LNG, tied to a Gulf Coast terminal under development.

Share:

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

Commonwealth LNG has signed a sale and purchase agreement with EQT Corporation for the supply of one million tonnes per annum (Mtpa) of liquefied natural gas (LNG) over a period of twenty years. The volumes will come from the 9.5 Mtpa export facility currently under development in Cameron Parish, Louisiana.

Under the terms of the contract, the LNG will be sold on a free-on-board basis at a price indexed to Henry Hub, the benchmark for US natural gas. The agreement strengthens EQT’s position in the export chain, while providing Commonwealth with a long-term commercial foundation ahead of its final investment decision scheduled for 2025.

A structuring partnership for the Louisiana terminal

Commercial LNG production is expected in 2029. With this new agreement, Commonwealth LNG has now secured 5 Mtpa under long-term binding contracts, including previously announced commitments with Glencore, JERA and PETRONAS. These volumes account for more than half of the terminal’s planned capacity.

Executives from both companies highlighted the strategic alignment of the deal. EQT President and Chief Executive Officer Toby Z. Rice said the agreement with Commonwealth strengthens his group’s position in the global LNG market. Ben Dell, Chairman of Caturus, the parent company of Commonwealth LNG, pointed to the integrated “wellhead-to-water” model and modular design of the facility as differentiating elements.

Strengthened outlook on export markets

The announcement reflects the rising interest in North American export projects amid international demand for LNG. Commonwealth’s business model is based on streamlined execution and optimised costs, combined with indexed contracts, appealing to buyers looking to secure long-term supply.

The company stated it has advanced visibility to commit its remaining capacity. The site’s commissioning schedule, set for 2029, positions it to meet favourable market conditions, particularly in Asia and Europe, where diversification of supply remains a priority.

Blackstone commits $1.2bn to develop Wolf Summit, a 600 MW combined-cycle natural gas plant, marking a first for West Virginia and addressing rising electricity demand across the Mid-Atlantic corridor.
UAE-based ADNOC Gas reports its highest-ever quarterly net income, driven by domestic sales growth and a new quarterly dividend policy valued at $896 million.
Caprock Midstream II invests in more than 90 miles of gas pipelines in Texas and strengthens its leadership with the arrival of Steve Jones, supporting its expansion in the dry gas sector.
Harvest Midstream has completed the acquisition of the Kenai liquefied natural gas terminal, a strategic move to repurpose existing infrastructure and support energy reliability in Southcentral Alaska.
Dana Gas signed a memorandum of understanding with the Syrian Petroleum Company to assess the revival of gas fields, leveraging a legal window opened by temporary sanction easings from European, British and US authorities.
With the commissioning of the Badr-15 well, Egypt reaffirms its commitment to energy security through public investment in gas exploration, amid declining output from its mature fields.
US-based Venture Global has signed a long-term liquefied natural gas (LNG) export agreement with Japan’s Mitsui, covering 1 MTPA over twenty years starting in 2029.
Natural Gas Services Group reported a strong third quarter, supported by fleet expansion and rising demand, leading to an upward revision of its full-year earnings outlook.
The visit of Kazakh President Kassym-Jomart Tokayev to Moscow confirms Russia's intention to consolidate its regional energy alliances, particularly in gas, amid a tense geopolitical and economic environment.
CSV Midstream Solutions launched operations at its Albright facility in the Montney, marking a key milestone in the deployment of Canadian sour gas treatment and sulphur recovery capacity.
Glenfarne has selected Baker Hughes to supply critical equipment for the Alaska LNG project, including a strategic investment, reinforcing the progress of one of the largest gas infrastructure initiatives in the United States.
Gas Liquids Engineering completed the engineering phase of the REEF project, a strategic liquefied gas infrastructure developed by AltaGas and Vopak to boost Canadian exports to Asia.
Kuwait National Petroleum Company aims to boost gas production to meet domestic demand driven by demographic growth and new residential projects.
Chinese group Jinhong Gas finalises a new industrial investment in Spain, marking its first European establishment and strengthening its global strategy in the industrial gas sector.
Appalachia, Permian and Haynesville each reach the scale of a national producer, anchor the United States’ exportable supply and set regional differentials, LNG arbitrage and compliance constraints across the chain, amid capacity ramp-ups and reinforced sanctions.
AltaGas finalises a $460mn equity raise linked to the strategic retention of its stake in the Mountain Valley Pipeline, prompting credit outlook upgrades from S&P and Fitch.
TotalEnergies has tasked Vallourec with supplying tubular solutions for drilling 48 wells as part of its integrated gas project in Iraq, reinforcing their ongoing industrial cooperation on the Ratawi field.
The Japanese energy group plans to replace four steam turbines at its Sodegaura site with three combined-cycle gas turbines, with full commissioning targeted for 2041.
Petrus Resources recorded a 7% increase in production in the third quarter of 2025, along with a reduction in net debt and a 21% rise in cash flow.
Venture Global has signed a liquefied natural gas sales agreement with Atlantic-See LNG Trade S.A., a newly formed Greek joint venture, to supply 0.5 million tonnes annually starting in 2030, reinforcing regional energy security.

All the latest energy news, all the time

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.