IAEA: Iran held 440.9 kg at 60% before Israeli strikes

A report by the International Atomic Energy Agency puts Iran’s 60% enriched uranium at 440.9 kg before Israeli and U.S. strikes, while the agency’s access to enrichment sites has remained suspended since the operations.

Share:

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

The International Atomic Energy Agency (IAEA — French: Agence internationale de l’énergie atomique) established that Iran’s stock of uranium enriched to 60% reached 440.9 kg in the form of uranium hexafluoride (UF6). According to the agency’s methodological yardstick, that quantity, if further enriched, represents a potential of roughly ten nuclear devices. The agency notes the material is in gaseous form, usable in centrifuge cascades to continue enrichment. Since the strikes targeting enrichment capabilities, the IAEA reports it lacks verified information on the exact status and location of the highly enriched stock.

Quantity, enrichment and conversion potential

Immediately prior to the military operations, the 440.9 kg of UF6 at 60% represented an increase compared with previous assessments. The 60% threshold lies close to the so-called weapons-grade level, generally associated with 90% uranium-235, and shortens the technical time required for final conversion. Effective yield, however, depends on industrial parameters including cascade configuration, separation factor and the operational availability of units. The reference to “ten devices” reflects an internal calculation yardstick used by the IAEA and does not imply specific designs or account for process losses.

The UF6 chemical form governs the entire isotope-separation chain and the handling constraints that accompany it. Material flow requires reliable feed, compression and vacuum systems to maintain centrifuge stability. Electrical continuity, rotor quality and line cleanliness directly influence achievable enrichment rates. Any prolonged interruption or infrastructure damage translates into efficiency losses and longer restoration work.

Facilities and reported damage

Strikes targeted sites linked to enrichment, including Natanz, Fordow and a complex in the Isfahan region. The Israel Defense Forces (IDF — French: Forces de défense d’Israël) stated that Iran possessed sufficient fissile material to assemble several devices on a short timeline and referenced a ramp-up in missile production. A communication from the Israel Atomic Energy Commission (IAEC — French: Commission israélienne de l’énergie atomique), shared by the U.S. executive, asserted that Fordow had been rendered inoperable. Commercial satellite imagery showed truck movements and earth-moving activity near underground entrances, with no independent IAEA access to characterize the extent of the damage.

The IAEA indicates that access modalities for affected installations remain under discussion with the Iranian authorities. Director General Rafael Grossi signaled that talks could not continue indefinitely and called for a prompt agreement on inspections and verification. The agency has not confirmed any transfer of stock or relocation of production units due to the absence of on-site inspections since the strikes. The precise status of centrifuge cascades at Fordow and Natanz therefore remains unverified by the monitoring body at this stage.

Operational parameters and watch points

Industrial operators typically assess three variables to estimate an enrichment program’s trajectory after an incident: the integrity of underground halls, the availability of reserve equipment and the capacity to restore power and process utilities. A combination of structural damage and access constraints can prolong restart timelines beyond planned maintenance windows. UF6 flows require a stable logistical chain from production through containment, making any disruption immediately visible in material balance sheets. The lack of IAEA access sustains uncertainty over volumes that are actually operational and over the timing of any resumption.

For stakeholders exposed to geopolitical risk, developments in inspection access, the real condition of enrichment capacity and the management of highly enriched stocks form the three decisive short-term indicators. Public statements by the parties provide reference points, but only field verification will refine the inventory and the configuration of cascades. Visibility on material availability and plant integrity will shape risk expectations tied to the region. The situation is therefore monitored through control channels and imagery pending verified parameters.

French state utility EDF has increased the maximum estimated cost for building six new nuclear reactors to €72.8 billion ($85.29 billion), representing a 40% rise over the original figure.
US-based Holtec has signed a memorandum of understanding with Hungary’s energy group MVM to assess the deployment of its SMR-300 technology, strengthening bilateral nuclear cooperation and opening prospects for a new market in Central Europe.
California-based startup Radiant has secured $300mn to build its first factory in Tennessee and prepare for the mass production of miniature nuclear reactors for off-grid applications.
Terra Innovatum has increased its interactions with the Nuclear Regulatory Commission to advance licensing of its SOLO™ micro-modular reactor, despite the partial shutdown of the US federal government.
The US nuclear regulator has extended the operating licences of three Illinois reactors by 20 years, strengthening Constellation's long-term industrial outlook for the Clinton and Dresden sites.
The SATURNE Industrial Chair aims to develop innovative uranium extraction methods, with joint funding from Orano and the National Research Agency over a four-year period.
US-based X-energy has signed a reservation agreement with South Korea's Doosan Enerbility to secure key components for its small modular nuclear reactors.
Samsung Heavy Industries has received Approval in Principle for a floating nuclear plant featuring two SMART100 reactors, marking a step toward the commercialisation of offshore small modular reactors.
The Indian government proposes a unified legal framework for nuclear energy, aiming to boost private investment and increase installed capacity to 100 GW by 2047.
Samsung C&T strengthens its presence in modular nuclear energy in Europe by signing an agreement with Synthos Green Energy to develop up to 24 SMRs in Poland and several Central European countries.
Israeli firm nT-Tao and Ben-Gurion University have developed a nonlinear control system that improves energy stability in fusion plasmas, strengthening the technical foundation of their future compact reactors.
The Indian government has introduced a bill allowing private companies to build and operate nuclear power plants, ending a state monopoly in place for over five decades.
Natura Resources enters a new regulatory phase for its molten salt reactor MSR-1, following the signing of a framework agreement with the US Department of Energy under the Reactor Pilot Program.
Norwegian Nuclear Decommissioning is surveying 22 localities to assess their interest in hosting storage facilities for radioactive waste from the country’s former research reactors.
Electricité de France's Flamanville 3 reactor has reached full power for the first time, marking a key industrial milestone in the deployment of EPRs in Europe, despite cost overruns reaching EUR23.7bn ($25.7bn).
GE Vernova Hitachi’s BWRX-300 small modular reactor has passed a key regulatory hurdle in the United Kingdom, opening the door to potential commercial deployment, despite no current plans for construction.
Molten salt reactor developer Natura Resources has acquired Shepherd Power and partnered with NOV to scale up modular reactor manufacturing by the next decade.
China National Nuclear Corporation expects commercial operation in 2026 for its ACP100 reactor, following successful cold testing and completion of critical structures in 2025.
Start-up SEATOM has been selected to join NATO's DIANA programme with its micro nuclear reactor designed for extreme environments, reinforcing its position in dual-use marine and military energy technologies.
The Estonian Ministry of Economic Affairs has opened a tender to select a site and conduct initial environmental studies for a 600 MW nuclear power plant, marking a decisive step for the country’s energy future.

All the latest energy news, all the time

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.