One of the drones from last weekend’s Ukrainian attack struck the Kursk nuclear power plant

The kamikaze drone damaged an auxiliary transformer at the Kursk plant, halving the output of its only reactor in operation, according to Rosatom and the International Atomic Energy Agency.

Share:

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25€/month*

*billed annually at 99€/year for the first year then 149,00€/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2€/month*
then 14.90€ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

During last weekend, one of the drone attacks launched from Ukraine directly hit the Kursk nuclear power plant. The drone, intercepted by air defenses, had its debris strike an auxiliary transformer, triggering a fire that was quickly contained by local emergency services. Rosatom, the Russian state-owned nuclear operator, confirmed that the output of Unit Kursk-3, a 1,000-megawatt RBMK reactor, had been reduced by 50%. No casualties were reported following the incident.

An infrastructure under security pressure

The Kursk plant consists of four RBMK units. Two have already been permanently shut down, and another is under scheduled maintenance, leaving Kursk-3 as the only reactor in service. Rosatom stated that this was the first time a drone attack had directly impacted nuclear operations in Russia. The Kursk region, bordering Ukraine, has been a frequent target of drone strikes in recent months, heightening pressure on energy infrastructure.

Increased monitoring of radiation levels

The International Atomic Energy Agency (IAEA) confirmed that radiation levels remained stable and within normal limits near the site. The agency noted, however, that it could not independently verify the exact cause of the damage. Meanwhile, Rospotrebnadzor, the Russian federal consumer protection authority, implemented reinforced monitoring, with measurements taken every two hours in populated areas near the plant.

Consequences for the Russian nuclear sector

In 2024, Rosatom had already considered a temporary shutdown of the Kursk plant due to security risks, following an armed incursion in the region. The construction of Kursk II, intended to gradually replace the RBMK units with more modern VVER reactors, was also affected. Last weekend’s incident highlights the growing vulnerability of Russian nuclear infrastructure to drone attacks, raising questions about supply security and Moscow’s ability to sustain its modernization projects under such conditions.

The Idaho National Laboratory has started irradiation testing on uranium-zirconium fuel samples from Lightbridge in its experimental reactor, marking a key step toward the industrial validation of advanced nuclear fuel.
NexGen Energy has opened Canadian Nuclear Safety Commission hearings for the final approval of its Rook I uranium project, following more than six years of regulatory process.
Oklo has signed a binding agreement with Siemens Energy to accelerate manufacturing of the energy conversion system for its first advanced nuclear power plant in the United States.
A security document handling incident at the nuclear power plant renews concerns about TEPCO as a key decision on restarting reactors 6 and 7 approaches in Niigata.
An initial civil nuclear cooperation agreement was signed between the United States and Saudi Arabia, prompting calls from the US Congress for strict safeguards to prevent a Middle East arms race.
The launch of the Zhaoyuan nuclear project anchors the Hualong One model inland, illustrating Beijing’s strategy of regulatory normalisation in response to Western technological restrictions.
TRISO-X has started above-ground works on the first U.S. facility dedicated to manufacturing fuel for small modular reactors, marking a key industrial milestone in the deployment of the Xe-100.
The first Russian test rig for the experimental ITER reactor has been delivered to the site in France, marking a major milestone in the international collaboration on nuclear fusion.
A strategic report reveals the industrial and energy potential of Allseas’ offshore small modular reactor, which could create up to 40,000 jobs and reduce investment in the power grid.
Canadian firm Aecon and private developer Norsk Kjernekraft have signed a strategic agreement targeting the deployment of BWRX-300 small modular reactors across several potential locations in Norway.
The South African government has officially lifted the PBMR reactor out of inactivity, launching a public investment programme and transferring the strategic nuclear asset from Eskom to Necsa.
The French Court of Auditors values EDF’s grand carénage at over €100bn, while EPR2 reactors already exceed €67–75bn. The State simultaneously directs regulation, financing, and industrial strategy, raising the risk of conflict of interest.
Belarus commits major public investment to add a third reactor at the Ostrovets plant and initiates studies for a second nuclear site to support national energy demand.
Framatome’s accident-tolerant fuel prototype has completed a second 24-month cycle in a commercial nuclear reactor in the United States, paving the way for a third phase of industrial testing.
The Wylfa site in Wales will host three Rolls-Royce small modular reactors from 2026, marking a strategic investment in the UK’s nuclear expansion.
EDF confirmed that the Flamanville EPR has reached a major milestone, while planning a nearly year-long shutdown in 2026 for extensive regulatory inspections and key component replacement.
EDF is opening access to its long-term nuclear supply contracts to companies consuming more than 7 GWh per year, an adjustment driven by the gradual end of the Arenh mechanism.
South Korean authorities have approved the continued operation of the Kori 2 reactor for an additional eight years, marking a key milestone in the national nuclear strategy.
A public-private consortium is developing a 5 MW thermal microreactor designed to operate without refuelling for ten years, marking a strategic step in Brazil's nuclear innovation efforts.
EDF has announced that the Flamanville EPR reactor is now operating at 80% of its capacity. The target of reaching full output by the end of autumn remains confirmed by the utility.

All the latest energy news, all the time

Annual subscription

8.25€/month*

*billed annually at 99€/year for the first year then 149,00€/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2€/month*
then 14.90€ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.