ENERCON Returns to Romania with a 38 MW Wind Project

After 12 years of absence, ENERCON signs a contract for a 38 MW wind farm in Romania under the PNRR program.

Share:

Gain full professional access to energynews.pro from 4.90$/month.
Designed for decision-makers, with no long-term commitment.

Over 30,000 articles published since 2021.
150 new market analyses every week to decode global energy trends.

Monthly Digital PRO PASS

Immediate Access
4.90$/month*

No commitment – cancel anytime, activation in 2 minutes.

*Special launch offer: 1st month at the indicated price, then 14.90 $/month, no long-term commitment.

Annual Digital PRO Pass

Full Annual Access
99$/year*

To access all of energynews.pro without any limits

*Introductory annual price for year one, automatically renewed at 149.00 $/year from the second year.

After a long absence from the Romanian market, ENERCON has signed a contract with Smart Power Generation Alfa S.R.L. to construct a 38 MW wind farm in Cudalbi, in the Galaţi region. This project, involving the installation of seven E-160 EP5 turbines on modular steel towers 120 meters high, is part of the National Recovery and Resilience Plan (PNRR) funded by the European Union.

A Strategic Return

ENERCON had left the Romanian market due to a slowdown in renewable energy development. Today, the situation is evolving thanks to financial incentives under the PNRR, which facilitate the realization of energy infrastructure projects.

With this project, ENERCON aims to strengthen its presence in Eastern Europe by targeting commercial opportunities enabled by stabilized regulatory and financial frameworks. The company will deploy its E-160 EP5 technology, which offers capabilities suited to the local market’s characteristics and the scale of the envisioned projects.

A Market Revitalized by European Funds

Romania experienced a slowdown in renewable energy development in recent years, but European funding is now changing the landscape. The Cudalbi wind farm fits into this dynamic, benefiting from institutional support to secure investments and reduce risks.

The PNRR provides direct funding for projects that meet specific objectives, including increasing energy production from renewable sources. This framework ensures the economic viability of projects while attracting players like ENERCON, who had left the market due to a previously perceived uncertain environment.

Commercial and Operational Challenges

ENERCON provides comprehensive solutions ranging from turbine supply to turnkey engineering services. This approach meets the expectations of local and international investors in terms of costs, efficiency, and timelines.

The 38 MW capacity is modest compared to other European projects but represents an important step in ENERCON’s strategy to return to an emerging market. The contract signed with Smart Power Generation Alfa S.R.L. could serve as a springboard for future collaborations, especially in a context where the EU’s climate goals push for diversification of energy sources.

Development Prospects

With this project, ENERCON is laying the groundwork for expanded operations in Romania. The company states that it is working on several similar projects in the country, which could strengthen its position against competitors. However, the success of these initiatives will depend on the ability to stabilize financial and institutional partnerships as well as manage technical and logistical constraints.

The Cudalbi wind farm is expected to be the first step in this strategy, and its operational outcomes will be closely watched by market players.

Orsted and two U.S. states have taken federal legal action to contest the abrupt halt of the Revolution Wind project, a $5 billion offshore venture now at risk of prolonged suspension.
SPIE Wind Connect will carry out subsea connections for phase II of the TPC project, a major development in Taiwan’s offshore wind sector with a projected annual capacity of 1,000 GWh.
Envision Energy launches its first project in Turkey in partnership with Yildizlar Group, adding 232 MW to the national wind capacity in Karaman province.
ABO Energy maintains its annual targets despite a drop in half-year profit, relying on cost-cutting measures and early project sales to secure cash flow.
Energiekontor has closed financing for two wind projects in Verden, with a combined 94 MW, with construction starting this year and commissioning scheduled for 2027.
South Korea has rejected all projects using foreign turbines in its 2025 offshore wind auction, marking a strategic shift in favour of local industry and energy security.
The Danish Energy Agency confirmed the rejection of 37 feasibility study permit applications, citing European Union state aid rules and lack of competition.
With an AUD$3 billion investment, ACEN launches one of Tasmania’s largest private projects, aiming for commissioning in 2030 and annual supply for 500,000 households.
In France, a 12.9 MW wind farm financed by local actors has been commissioned in Martigné-Ferchaud, showcasing an unprecedented model of shared governance between citizens, local authorities and public investment companies.
The governors of five states urged the Trump administration to maintain permits for threatened offshore wind projects, citing massive investments and jobs at stake in a nascent industry.
Green Wind Renewables is developing a 450 MW wind farm in the Wheatbelt region of Australia, with up to 75 turbines and an estimated annual output of 1.5 TWh.
German group RWE has commissioned five new power plants in France, adding 83 MW to its portfolio, following repeated successes in tenders organised by the Energy Regulatory Commission.
The 600 MW onshore wind farm in Laos achieves commercial operation four months early, injecting power into Vietnam via a 500 kV interconnection and consolidating an international financing package of $950mn.
Equinor confirms its participation in Ørsted’s capital increase, aiming to maintain its 10% stake and support the financial stability of the Danish group facing headwinds in offshore wind.
Chinese manufacturer Dongfang Electric has installed a 26 MW offshore wind turbine in Shandong province, setting a double world record for power and rotor diameter.
Facing unforeseen cost increases and a tightening regulatory environment, Mitsubishi Corporation is pulling out of three offshore wind projects, casting doubt on Japan's renewable energy ambitions.
With 323 millions USD in cash, Polenergia strengthens its investments in offshore wind, solar and storage, targeting more than 2.3 GW of new energy capacity in Poland.
French group Valorem has commissioned the ViIatti wind complex in Finland, made up of two farms totalling 313 MW and an estimated annual output of 1 TWh.
The Revolution Wind project, already 80% complete, has been halted by the U.S. administration over national security concerns, creating major uncertainty in the sector.
Quebec funds a mobile training unit to address the shortage of wind turbine maintenance technicians, estimated at 400 positions by 2029.

Log in to read this article

You'll also have access to a selection of our best content.