India: MEIL to develop 4000 MW of hydroelectric storage in Maharashtra

Megha Engineering & Infrastructures Limited (MEIL) is developing two hydroelectric storage projects in Maharashtra, with a total capacity of 4,000 MW, marking a breakthrough in energy management in India.

Share:

Gain full professional access to energynews.pro from 4.90$/month.
Designed for decision-makers, with no long-term commitment.

Over 30,000 articles published since 2021.
150 new market analyses every week to decode global energy trends.

Monthly Digital PRO PASS

Immediate Access
4.90$/month*

No commitment – cancel anytime, activation in 2 minutes.

*Special launch offer: 1st month at the indicated price, then 14.90 $/month, no long-term commitment.

Annual Digital PRO Pass

Full Annual Access
99$/year*

To access all of energynews.pro without any limits

*Introductory annual price for year one, automatically renewed at 149.00 $/year from the second year.

Megha Engineering & Infrastructures Limited (MEIL) has signed a Memorandum of Understanding with the Government of Maharashtra for the implementation of two pumped storage hydroelectric projects.
These projects, located in the Nandurbar and Chhatrapati Sambhajinagar districts, have a total capacity of 4,000 MW.
The choice of the “Build-Operate-Maintain” (BOM) model reflects the commitment of both parties to ensuring the efficient operation and maintenance of the power plants over the long term.
With a total estimated investment of 21,100 crores of rupees (around 2.5 billion euros), these projects aim to strengthen the energy infrastructure of the state of Maharashtra, while optimizing the management of electricity flows.
The facilities will provide a minimum daily storage capacity of 6 hours, thus meeting energy needs of the state and the country.

Technology and innovation for the network

The Kamod and Ghosla projects are based on a closed-loop system of upper and lower reservoirs.
This configuration enables the turbines to operate in both directions, pumping water during periods of low demand and generating electricity during peaks in consumption.
Reservoirs will be initially filled from existing water reservoirs, and water will be replenished annually to compensate for natural losses.
The installations will use reversible turbines capable of operating according to the needs of the grid, enabling greater flexibility in managing energy demand.
These systems also allow for better integration of renewable energy sources, such as solar and wind power, which require storage solutions to compensate for their intermittency.

Financial and operational challenges

The total cost of these projects, in the region of 21,100 crores of rupees, reflects the scale of the work required, from the construction of new reservoirs to the installation of pumped storage technology.
The financing is based on a scheme integrated into the State’s energy policy framework, which prioritizes infrastructure capable of meeting decarbonization and energy security objectives.
MEIL is also committed to creating 2,500 direct jobs, thereby strengthening the local economic fabric.
However, there are technical and environmental challenges ahead, particularly in terms of water resource management and implementation timescales.

Regulation and legal framework

These projects are part of Maharashtra’s wider energy policy, which focuses on diversifying energy sources and optimizing storage capacity.
The use of pumped hydro storage projects is supported by the central government, which encourages the development of large-scale storage technologies.
These infrastructures help to stabilize power grids while facilitating the integration of renewable energies.
The Maharashtra government is proactive in supporting this type of project, backed by a regulatory framework that encourages public-private partnerships.
The flexibility of this model means that objectives can be adjusted according to the needs of the region, while taking into account the imperatives of profitability and efficiency.

Impact on India’s energy sector

The Kamod and Ghosla projects illustrate the growing importance of energy storage infrastructures in India, a country facing increasing demand for electricity.
These initiatives mark a step forward in improving grid stability and optimizing demand management capabilities.
They also reinforce Maharashtra’s position as a leader in the development of large-scale energy projects.
India’s energy sector continues to undergo rapid transformation, with a particular focus on storage capacity to support the growth of renewable energies.
In this context, initiatives such as MEIL are of crucial importance in ensuring long-term grid stability.

Scottish developer Fidra Energy reaches financial close on its Thorpe Marsh site, with equity funding led by EIG and the UK’s National Wealth Fund, marking a significant step in the UK’s energy storage sector.
Grenergy has secured $270mn in non-recourse financing to install 3.5 GWh of batteries in Phase 6 of the Oasis de Atacama project, marking a major step in expanding its energy storage capacity in Chile.
Eos Energy rolls out DawnOS, a U.S.-developed control software platform designed to maximise performance and security across Eos Z3 storage systems.
StarCharge has signed a contract to supply 1 GWh of battery energy storage systems to Prozeal Green Energy, strengthening its presence in the Indian market and continuing its international expansion.
Kallista Energy has entrusted ENGIE with the commercial operation of its first BESS site in Saleux, with a capacity of 120 MW, scheduled for commissioning by the end of 2026.
Dutch company PowerField has launched a fully automated frequency reserve service, integrating solar generation, battery storage and trading, with initial operations validated by grid operator TenneT.
Following its acquisition of Northvolt’s assets, US-based Lyten has appointed several former executives of the Swedish battery maker to key roles to restart production in Europe.
US-based contractor TruGrid has completed three battery installations in Texas ahead of schedule and within budget, despite weather disruptions and logistical challenges that typically impact such projects.
GazelEnergie plans to build a data center at its coal-fired plant in Saint-Avold, with commissioning expected in 2028 and a capacity of 300 MW.
Ormat Technologies has begun commercial operation of its new energy storage facility in Texas, alongside a seven-year tolling agreement and a hybrid tax equity deal with Morgan Stanley Renewables.
German grid operators face a surge in battery storage connection requests, driven by a flawed approval process.
TWAICE will equip four energy storage sites in Southern California with its analytics platform, supporting operator Fullmark Energy in CAISO market compliance and performance optimisation.
CATL unveiled in São Paulo its new 9MWh TENER Stack system, designed for the South American market, responding to rising demand for energy storage driven by the growth of renewable energy.
EdgeConneX has acquired a second site in the Osaka region, bringing its total capacity to 350MW to support the growth of the Cloud and AI market in Japan.
Driven by grid flexibility demand and utility investments, the global containerized BESS market will grow at an annual rate of 20.9% through 2030.
The American battery materials manufacturer, Group14, finalizes a $463 million fundraising round and acquires full ownership of its South Korean joint venture from conglomerate SK Inc.
Energy Plug Technologies partnered with GGVentures to deliver three energy storage systems to the U.S. construction sector, marking its first commercial breakthrough in this strategic market.
HD Renewable Energy has completed the connection of its Helios storage system to the Hokkaido grid. The 50 MW project is expected to enter commercial operation by the end of 2025, targeting multiple segments of the Japanese electricity market.
Ingeteam partners with JinkoSolar and ACLE Services to equip seven sites in Australia, representing a total capacity of 35 MW and 70 MWh of energy storage.
Copenhagen Infrastructure Partners has acquired from EDF power solutions North America the Beehive project, a 1 gigawatt-hour battery storage facility located in Arizona.

Log in to read this article

You'll also have access to a selection of our best content.