Vestas completes installation of wind turbines for Zhong Neng offshore wind farm in Taiwan

Share:

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

Vestas completes turbine installation for the Zhong Neng offshore wind farm, located off the coast of Taiwan.
With 31 V174-9.5 MW wind turbines in operation, the project reaches a capacity of 300 MW, meeting part of the country’s energy demand.
This wind farm plays a central role in Taiwan’s efforts to increase the share of renewable energies in its energy mix, aiming for a rise from 11% to 30% by 2030.

Strategic challenges for Taiwan’s energy sector

Against a backdrop of growing demand for renewable energies, linked to the high energy intensity of the semiconductor and artificial intelligence industries, Taiwan is seeking to diversify its energy sources.
The development of offshore wind farms like Zhong Neng is a direct response to the country’s energy security challenges.
The commissioning of these 31 wind turbines contributes to this diversification effort, while tapping local potential for critical turbine components.

Complex installation and local collaboration

The Zhong Neng facility stands out for its ability to overcome complex challenges, including harsh climatic conditions such as typhoons and frequent earthquakes.
Cooperation between Vestas and its local partners was essential.
Components such as blades, towers and hubs were manufactured by local companies, including Tienli Offshore Wind and Fortune Electric Co, Ltd, thus reinforcing local integration and reducing logistics costs.

Impact on the local supply chain

The project relies heavily on a Taiwanese supply chain for wind turbine components.
This strategy has involved players such as Swancor for blade materials, YeongGuan Group for castings, and CS Wind for tower manufacture.
By integrating these local suppliers, the Zhong Neng wind farm is positioned as a model of localization, minimizing dependence on imports and maximizing local added value.

Outlook for offshore wind power development

The completion of Zhong Neng offers interesting prospects for the future development of offshore wind energy in Taiwan.
The results achieved through this collaboration between international and local players could encourage further investment in this sector.
In addition, the increased localization of the supply chain could stimulate further projects, reducing costs and improving the resilience of operations to the vagaries of the global supply chain.
Future offshore wind developments in Taiwan will depend on the ability to replicate this model of industrial cooperation and local integration.
Future initiatives could build on the lessons learned from Zhong Neng, with the potential for stronger partnerships between international investors and local companies.

German group BayWa r.e. has tasked Enercoop Bretagne with implementing a citizen investment scheme for its planned wind farm in Plouisy, aiming for shared governance and stronger local involvement.
US wind capacity fell in Q2, but developers anticipate a sharp increase by late 2025, with 46 GW of new capacity forecast by 2029 and a peak in 2027.
Engie has signed a renewable electricity supply contract with Apple covering 173 MW of installed capacity in Italy, with commissioning scheduled between 2026 and 2027.
Renova a soumis une méthodologie d’évaluation environnementale pour un projet éolien terrestre de 280MW à Higashidori, renforçant son positionnement sur les technologies renouvelables au Japon.
The joint venture between BP and JERA ends its offshore wind ambitions in the United States, citing an unfavourable economic and regulatory environment for continuing the development of the Beacon Wind project.
With a 300 MW partnership signed with Nadara, Q ENERGY exceeds 1 GW of wind repowering projects in France, reinforcing its position in a market driven by public investment dynamics.
The acquisition of Cosmic Group by FairWind consolidates its position in Australia and marks a strategic expansion into New Zealand and Japan.
Danish manufacturer Vestas has paused construction of its planned facility in Poland, originally set for 2026, citing weaker-than-expected European offshore wind demand.
British operator Equitix has been selected to take over transmission assets of the Neart na Gaoithe offshore wind farm, a £450mn ($547mn) project awarded under Ofgem’s tenth tender round.
Energiequelle GmbH has launched replacement work for old turbines at its Minden-Hahlen site, aiming for long-term structural maintenance with the installation of three new 200-metre machines.
GE Vernova will equip the Ialomiţa wind farm with 42 turbines of 6.1 MW, strengthening its presence in the European onshore wind sector with a 252 MW project in partnership with Greenvolt.
Eversource Energy posts a one-time $75mn charge linked to unforeseen costs in the Revolution Wind project, while tightening its 2025 earnings forecast.
The Renewables Infrastructure Group has signed a ten-year power purchase agreement with Virgin Media O2 for its onshore wind farms in the United Kingdom, ensuring price stability for both parties.
Eight local associations in Normandy and Hauts-de-France will receive a total of €120,000, financed by revenues from three RWE wind farms, to support public-impact projects in 2025.
CWP Europe formalised two major projects in Albania and Montenegro with backing from the European Commission, reinforcing the Balkans’ integration into the European energy market.
Elawan Energy secured two wind power projects totalling 92MW in Romania through a long-term public contract, strengthening its presence in the region with operations scheduled to begin in 2028.
A study conducted in the Gulf of Lion highlights the risk of collisions between migratory birds and floating wind turbine blades, as the region prepares to host 19 additional turbines by 2031.
Taaleri Energia’s SolarWind III Fund partners with Lords LB Asset Management to develop a 112 MW onshore wind project in Smiltene, scheduled for commissioning in early 2027.
The Dinawan Wind Farm project, first phase of a 1.3 GW energy hub, was selected in the fourth tender round of the Capacity Investment Scheme launched by the Australian Government.
RWE has completed construction of the Kail wind farm, comprising three turbines totalling 12.9 MW, marking its first commissioning in Rhineland-Palatinate.

All the latest energy news, all the time

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.