United States: deployment of 300 MWh of storage in Virginia

Three 300 MWh energy storage projects in Virginia by EVLO aim to strengthen the power grid as part of the Virginia Clean Economy Act.

Share:

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

Virginia is pursuing its energy transition goal with the implementation of 300 MWh of energy storage capacity supplied by EVLO Energy Storage Inc. a subsidiary of Hydro-Québec.
These projects, scheduled for 2025 and 2026, are part of the Virginia Clean Economy Act (VCEA), legislation enacted to transform the electric grid to achieve 100% clean energy by 2050.

Strategic storage for grid stability

The first project concerns a 5 MWh microgrid combined with a solar installation.
The aim is to test and develop solutions to improve energy management in a context of renewable production.
This microgrid will serve as an experimental platform for optimizing the integration of renewable energies into the existing grid.
A second project, with a capacity of 75 MWh, will enhance the reliability of the local grid.
It will enable excess energy to be stored during periods of low demand and released during peaks in consumption, thus contributing to grid stability and efficient energy management.

Expansion of storage infrastructures

The third project, planned to be the largest at 225 MWh, will be integrated into a major transmission hub in Virginia.
This storage infrastructure will play a key role in the efficient use of solar energy, maximizing the use of renewable resources and meeting grid requirements for flexibility and energy security.
These three initiatives demonstrate Virginia’s commitment to modernizing its energy infrastructure while complying with the legal requirements imposed by the VCEA.
The aim is to ensure optimal management of renewable energy, improve energy security and guarantee a continuous supply of electricity for industrial and commercial users.

System security and compliance

The EVLO storage systems integrated into these projects comply with the most stringent safety standards, including UL 9540 certification, which is the North American standard for grid-connected batteries.
System design includes active and passive safety measures to prevent fire hazards, ensuring safe and reliable operation.
By relying on robust, secure technological solutions, Virginia is positioning itself to achieve its energy transition goals without compromising the stability of its grid.
These energy storage projects are not only essential to meet current energy needs, but also to prepare the state for future energy management challenges.

Peregrine Energy Solutions has begun construction on a 500 MWh storage project in Texas, relying on Wärtsilä's technology and WHC's engineering expertise to enhance ERCOT grid flexibility.
The world's largest battery energy storage system enters service in Saudi Arabia, with an annual capacity of 2.2 billion kWh spread across three strategic sites in the southwest of the country.
Masdar begins commercial operations at a Stockport battery storage unit and announces two more UK projects, part of a £1bn ($1.25bn) plan for 3GWh of BESS capacity.
Australia-based storage platform Akaysha Energy has launched its first operational project, a 155 MW battery in Queensland, while confirming its expansion to over 1 GWh.
LehmanSoft Japan connected a 2MW/8.1MWh energy storage facility to the grid in Chichibu City, marking its entry into the Japanese stationary storage market.
Akuo launches a large-scale electricity storage project in Boulouparis, with a 200 MWh capacity, to support New Caledonia’s grid stability and reinforce the integration of renewable energies.
Spie and Tesla have signed a framework agreement to install battery electricity storage systems in Europe, focusing on France, Poland and Germany.
The group has won a strategic project with operator Amprion to deploy five 50 MW batteries to ease pressure on the German power grid and optimise electricity transmission.
Vena Energy has begun construction of a 408 MWh battery energy storage system in Tailem Bend, marking a new phase in the deployment of its infrastructure in Australia.
The explosion of battery storage applications in Germany is causing grid congestion and pushing Berlin to revise its regulatory framework to prevent market saturation.
The collapse in storage costs positions batteries as a key lever for dispatchable solar, but dependence on Chinese suppliers creates growing tension between competitiveness and supply chain security.
JA Solar has launched a microgrid combining 5.2 MW of solar and 2.61 MWh of storage at an industrial site in Sicily, marking its first application of the "PV+Storage+X" model in Italy.
Sinexcel has installed a 2MW/8MWh energy storage system in Matsusaka, marking a breakthrough in a regulated market after five years of technical partnerships and gradual deployment in Japan.
Inlyte Energy has successfully completed factory validation testing of its first full-scale iron-sodium battery, witnessed by Southern Company, paving the way for a pilot installation in the United States in early 2026.
Neoen begins construction of a new 305 MW stage in Australia, raising its total battery storage capacity in the country to 2 GW, and signs two additional virtual battery contracts with ENGIE.
ENGIE has awarded NHOA Energy the contract for a 320 MWh battery energy storage system in Drogenbos, marking a new step in their industrial partnership in Belgium.
Stardust Power has completed an independent review of its lithium refinery project in Muskogee, confirming technical feasibility and compliance with industry standards for its initial production phase.
California-based battery manufacturer South 8 Technologies has secured $11mn to boost production of its LiGas cells, targeting military and space applications under extreme conditions.
Samsung SDI will supply LFP cells for energy storage systems in the United States starting in 2027, under a multi-year deal valued at $1.53bn.
Bitzero Holdings launches a new 70 MW expansion phase in Namsskogan, Norway, targeting a total capacity of 110 MW and an upgrade of its high-performance computing capabilities.

All the latest energy news, all the time

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.