AGL: 250 MW battery in South Australia

Share:

Gain full professional access to energynews.pro from 4.90$/month.
Designed for decision-makers, with no long-term commitment.

Over 30,000 articles published since 2021.
150 new market analyses every week to decode global energy trends.

Monthly Digital PRO PASS

Immediate Access
4.90$/month*

No commitment – cancel anytime, activation in 2 minutes.

*Special launch offer: 1st month at the indicated price, then 14.90 $/month, no long-term commitment.

Annual Digital PRO Pass

Full Annual Access
99$/year*

To access all of energynews.pro without any limits

*Introductory annual price for year one, automatically renewed at 149.00 $/year from the second year.

AGL will begin construction this year of a 250 MW battery on Torrens Island, near Adelaide, Australia.
The Australian company aims to have the project fully operational by 2023.

AGL develops 250 MW of energy storage

Reliable, affordable energy for all

The battery at the Torrens site is the first in the AGL network.
The company has the backing of the South Australian State Government, which is aiming to achieve carbon neutrality by 2050.
With South Australia generating more wind power than any other Australian state, this battery will help manage a reliable supply of energy for the population.
Because of their ability to better manage the supply of renewable energies, particularly when they are intermittent.
AGL’s 250 MW battery is expected to have an autonomy of 4 hours.
This will enable it to adapt to changing market conditions.

The largest battery financed by the private sector

This battery will give South Australia “the largest battery” financed by the private sector.
AGL’s investment is a strong vote of confidence in the government’s energy policies.
Earlier this year, AGL signed agreements with global energy storage technology companies Wartsila and Fluence.
This investment demonstrates the confidence of the private sector in South Australian energy.

Scottish developer Fidra Energy reaches financial close on its Thorpe Marsh site, with equity funding led by EIG and the UK’s National Wealth Fund, marking a significant step in the UK’s energy storage sector.
Grenergy has secured $270mn in non-recourse financing to install 3.5 GWh of batteries in Phase 6 of the Oasis de Atacama project, marking a major step in expanding its energy storage capacity in Chile.
Eos Energy rolls out DawnOS, a U.S.-developed control software platform designed to maximise performance and security across Eos Z3 storage systems.
StarCharge has signed a contract to supply 1 GWh of battery energy storage systems to Prozeal Green Energy, strengthening its presence in the Indian market and continuing its international expansion.
Kallista Energy has entrusted ENGIE with the commercial operation of its first BESS site in Saleux, with a capacity of 120 MW, scheduled for commissioning by the end of 2026.
Dutch company PowerField has launched a fully automated frequency reserve service, integrating solar generation, battery storage and trading, with initial operations validated by grid operator TenneT.
Following its acquisition of Northvolt’s assets, US-based Lyten has appointed several former executives of the Swedish battery maker to key roles to restart production in Europe.
US-based contractor TruGrid has completed three battery installations in Texas ahead of schedule and within budget, despite weather disruptions and logistical challenges that typically impact such projects.
GazelEnergie plans to build a data center at its coal-fired plant in Saint-Avold, with commissioning expected in 2028 and a capacity of 300 MW.
Ormat Technologies has begun commercial operation of its new energy storage facility in Texas, alongside a seven-year tolling agreement and a hybrid tax equity deal with Morgan Stanley Renewables.
German grid operators face a surge in battery storage connection requests, driven by a flawed approval process.
TWAICE will equip four energy storage sites in Southern California with its analytics platform, supporting operator Fullmark Energy in CAISO market compliance and performance optimisation.
CATL unveiled in São Paulo its new 9MWh TENER Stack system, designed for the South American market, responding to rising demand for energy storage driven by the growth of renewable energy.
EdgeConneX has acquired a second site in the Osaka region, bringing its total capacity to 350MW to support the growth of the Cloud and AI market in Japan.
Driven by grid flexibility demand and utility investments, the global containerized BESS market will grow at an annual rate of 20.9% through 2030.
The American battery materials manufacturer, Group14, finalizes a $463 million fundraising round and acquires full ownership of its South Korean joint venture from conglomerate SK Inc.
Energy Plug Technologies partnered with GGVentures to deliver three energy storage systems to the U.S. construction sector, marking its first commercial breakthrough in this strategic market.
HD Renewable Energy has completed the connection of its Helios storage system to the Hokkaido grid. The 50 MW project is expected to enter commercial operation by the end of 2025, targeting multiple segments of the Japanese electricity market.
Ingeteam partners with JinkoSolar and ACLE Services to equip seven sites in Australia, representing a total capacity of 35 MW and 70 MWh of energy storage.
Copenhagen Infrastructure Partners has acquired from EDF power solutions North America the Beehive project, a 1 gigawatt-hour battery storage facility located in Arizona.

Log in to read this article

You'll also have access to a selection of our best content.