EnBW completes installation of 64 foundations for He Dreiht offshore wind farm

EnBW completes installation of the 64 foundations for the He Dreiht wind farm, marking a major step forward in this 960 MW project in the North Sea, planned to power 1.1 million homes by the end of 2025.

Share:

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

EnBW completes installation of the 64 foundations required to build the He Dreiht offshore wind farm.
Located in the North Sea, this project, which will have a total capacity of 960 megawatts, is part of Germany’s energy ambitions.
The foundations, consisting of steel monopiles, are 70 metres long and weigh 1,350 tonnes each.
These structures, essential for the stability of the wind turbines, were installed in just three months using Heerema’s “Thialf” floating crane.
The turbines, each with a capacity of 15 MW, will be installed in spring 2025.
They will enable the park to generate electricity capable of powering around 1.1 million homes.
He Dreiht is being developed without public subsidies, a financial model which could influence other similar projects in Europe, and which demonstrates the profitable prospects of offshore wind projects.

Technical advances and operational challenges

The He Dreiht site mobilizes considerable resources, with over 500 professionals and 60 vessels involved in the operations.
The installation of the foundations represents a critical phase, both in terms of technical complexity and maritime conditions.
The robustness of these structures is crucial to the success of the project, especially in an environment as demanding as the North Sea.
The operation of the wind farm, once the turbines have been installed, will require rigorous management.
The challenges of maintenance and integration into the German power grid are central to ensuring stable, secure production.
EnBW’s decision to dispense with subsidies is based on the long-term profitability of this project, reinforcing the economic viability of large-scale energy infrastructures.

The Chinese wind turbine manufacturer and Saudi operator sign a seven-year framework agreement to deploy local production lines and enhance technological cooperation in several strategic markets.
Iberdrola has installed the high-voltage direct current converter station for its East Anglia THREE wind farm, marking a key milestone in a €5 billion project.
Driven by solid operational performance, Nordex has raised its 2025 EBITDA margin forecast to 7.5–8.5%, up from the previous 5–7%, following a significant improvement in preliminary third-quarter results.
Neoen’s Goyder South Wind Farm reaches full generation capacity, strengthening the French group’s presence in Australia’s energy market with 412 MW connected to the grid.
The Australian government has granted environmental approval for the 108 MW Waddi Wind Farm, a Tilt Renewables project with construction costs exceeding $400mn.
The 180 MW Nimbus wind project enters its final phase of construction in Arkansas, with commercial operation scheduled for early 2026.
Faced with market uncertainty in Europe, Siemens Gamesa pauses a planned industrial investment in Esbjerg, highlighting structural difficulties in the offshore wind sector.
Institutional deadlock in France delays tenders and weakens the offshore wind sector, triggering job cuts and major industrial withdrawals from the market.
The Lithuanian energy group has signed a EUR 318 million financing agreement for its 314 MW wind project, the largest in the Baltic states.
German group BayWa r.e. has tasked Enercoop Bretagne with implementing a citizen investment scheme for its planned wind farm in Plouisy, aiming for shared governance and stronger local involvement.
US wind capacity fell in Q2, but developers anticipate a sharp increase by late 2025, with 46 GW of new capacity forecast by 2029 and a peak in 2027.
Engie has signed a renewable electricity supply contract with Apple covering 173 MW of installed capacity in Italy, with commissioning scheduled between 2026 and 2027.
Renova a soumis une méthodologie d’évaluation environnementale pour un projet éolien terrestre de 280MW à Higashidori, renforçant son positionnement sur les technologies renouvelables au Japon.
The joint venture between BP and JERA ends its offshore wind ambitions in the United States, citing an unfavourable economic and regulatory environment for continuing the development of the Beacon Wind project.
With a 300 MW partnership signed with Nadara, Q ENERGY exceeds 1 GW of wind repowering projects in France, reinforcing its position in a market driven by public investment dynamics.
The acquisition of Cosmic Group by FairWind consolidates its position in Australia and marks a strategic expansion into New Zealand and Japan.
Danish manufacturer Vestas has paused construction of its planned facility in Poland, originally set for 2026, citing weaker-than-expected European offshore wind demand.
British operator Equitix has been selected to take over transmission assets of the Neart na Gaoithe offshore wind farm, a £450mn ($547mn) project awarded under Ofgem’s tenth tender round.
Energiequelle GmbH has launched replacement work for old turbines at its Minden-Hahlen site, aiming for long-term structural maintenance with the installation of three new 200-metre machines.
GE Vernova will equip the Ialomiţa wind farm with 42 turbines of 6.1 MW, strengthening its presence in the European onshore wind sector with a 252 MW project in partnership with Greenvolt.

All the latest energy news, all the time

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.