Zelestra signs 1 GWh storage agreement with Sungrow in Chile

The Aurora project, under construction in Tarapacá, will include 1 GWh of batteries and a 220 MW solar plant, making it one of the largest hybrid systems in Latin America.

Share:

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

Zelestra, an international multi-technology energy project developer, has signed an agreement with Chinese supplier Sungrow for the delivery of a 1 GWh battery storage system as part of the Aurora hybrid project located in Tarapacá, northern Chile. The deal includes the deployment of Sungrow’s PowerTitan 2.0 liquid-cooled battery system and its medium-voltage power conversion units.

One of the continent’s largest hybrid systems

The Aurora project combines battery storage and solar generation, featuring a 220 MW direct current solar plant also equipped with Sungrow’s 1+X modular inverters. The installed capacity will produce approximately 600 GWh per year, equivalent to the annual consumption of 200,000 Chilean households. The site is currently under construction, with storage units scheduled for delivery in the fourth quarter of 2025.

This development is part of a tailored solution designed by Zelestra to supply electricity to Abastible, a major player in Chile’s liquefied petroleum gas sector and an active participant in the electricity market. Through a long-term power purchase agreement (PPA), Abastible will receive a guaranteed supply of solar energy during night-time hours.

Energy logistics structured around a PPA

The agreement represents a key milestone for Zelestra, which has a project portfolio exceeding 7 GW across Latin America, including 1.7 GW under contract, construction or in operation. The company was ranked among the top ten sellers of clean electricity to corporate customers worldwide by BloombergNEF, and second in the Europe, Middle East and Asia region.

For Sungrow, the project reinforces its expansion strategy in Latin America’s large-scale storage segment. The PowerTitan 2.0 system, designed to optimise thermal and energy performance, will be integrated into the existing solar infrastructure, forming one of the most complex hybrid projects on the continent.

Infrastructure with high market value

The Tarapacá region, characterised by strong solar irradiance and a developing electrical infrastructure, presents strategic potential for large-scale hybrid projects. The site’s connection to the national grid will enable better integration of intermittent renewable energy, with the battery system expected to support demand during peak periods.

This project strengthens the position of both Zelestra and Sungrow in the combined solar-storage solutions segment, responding to increasing demands for flexibility in Chile’s power system. The scale of technical deployment and contractualisation through a PPA reflect regional market shifts towards high-value energy solutions.

Akuo launches a large-scale electricity storage project in Boulouparis, with a 200 MWh capacity, to support New Caledonia’s grid stability and reinforce the integration of renewable energies.
Spie and Tesla have signed a framework agreement to install battery electricity storage systems in Europe, focusing on France, Poland and Germany.
The group has won a strategic project with operator Amprion to deploy five 50 MW batteries to ease pressure on the German power grid and optimise electricity transmission.
Vena Energy has begun construction of a 408 MWh battery energy storage system in Tailem Bend, marking a new phase in the deployment of its infrastructure in Australia.
The explosion of battery storage applications in Germany is causing grid congestion and pushing Berlin to revise its regulatory framework to prevent market saturation.
The collapse in storage costs positions batteries as a key lever for dispatchable solar, but dependence on Chinese suppliers creates growing tension between competitiveness and supply chain security.
JA Solar has launched a microgrid combining 5.2 MW of solar and 2.61 MWh of storage at an industrial site in Sicily, marking its first application of the "PV+Storage+X" model in Italy.
Sinexcel has installed a 2MW/8MWh energy storage system in Matsusaka, marking a breakthrough in a regulated market after five years of technical partnerships and gradual deployment in Japan.
Inlyte Energy has successfully completed factory validation testing of its first full-scale iron-sodium battery, witnessed by Southern Company, paving the way for a pilot installation in the United States in early 2026.
Neoen begins construction of a new 305 MW stage in Australia, raising its total battery storage capacity in the country to 2 GW, and signs two additional virtual battery contracts with ENGIE.
ENGIE has awarded NHOA Energy the contract for a 320 MWh battery energy storage system in Drogenbos, marking a new step in their industrial partnership in Belgium.
Stardust Power has completed an independent review of its lithium refinery project in Muskogee, confirming technical feasibility and compliance with industry standards for its initial production phase.
California-based battery manufacturer South 8 Technologies has secured $11mn to boost production of its LiGas cells, targeting military and space applications under extreme conditions.
Samsung SDI will supply LFP cells for energy storage systems in the United States starting in 2027, under a multi-year deal valued at $1.53bn.
Bitzero Holdings launches a new 70 MW expansion phase in Namsskogan, Norway, targeting a total capacity of 110 MW and an upgrade of its high-performance computing capabilities.
Remixpoint and Nippon Chikudenchi have formalised a partnership to develop seven 2MW/8MWh BESS facilities by October 2026 through a newly established joint venture.
UK-based Ray Systems has selected Beam Global to supply tailored battery systems for its new autonomous underwater drones, aiming to extend mission duration without compromising stealth or manoeuvrability.
Sungrow has started construction on a 200 MW/400 MWh battery storage system for ENGIE, aimed at strengthening grid stability in a state heavily reliant on renewable energy.
Blue Current secures over $80mn in funding led by Amazon to industrialise its silicon solid-state batteries for large-scale mobility and stationary applications.
AGL has begun construction of a 500 MW battery storage system in Tomago, a project valued at AUD800mn ($530.8mn), in the Hunter region, with commissioning expected in 2027.

All the latest energy news, all the time

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.