The offshore wind sector is on course to exceed 520 GW of installed capacity by 2040, despite logistical challenges, with a strong concentration in Europe thanks to floating wind.
The offshore wind sector is on course to exceed 520 GW of installed capacity by 2040, despite logistical challenges, with a strong concentration in Europe thanks to floating wind.
Brazil, through Indústrias Nucleares do Brasil (INB), is reactivating uranium exploration after 40 years, motivated by the lucrative prospects of the global nuclear market.
Brazil, through Indústrias Nucleares do Brasil (INB), is reactivating uranium exploration after 40 years, motivated by the lucrative prospects of the global nuclear market.
Restrictions imposed by the Operador Nacional do Sistema Elétrico (ONS) in Brazil are disrupting the profitability of wind and solar projects, creating uncertainty for investors in the renewable energy sector.
Restrictions imposed by the Operador Nacional do Sistema Elétrico (ONS) in Brazil are disrupting the profitability of wind and solar projects, creating uncertainty for investors in the renewable energy sector.
Prumo Logística and Fuella are collaborating to develop a low-carbon hydrogen hub at the Port of Açu, with targeted production of 400,000 tonnes per year for export and the domestic market.
Prumo Logística and Fuella are collaborating to develop a low-carbon hydrogen hub at the Port of Açu, with targeted production of 400,000 tonnes per year for export and the domestic market.
Prumo Logística and Fuella are collaborating to develop a low-carbon hydrogen hub at the Port of Açu, with targeted production of 400,000 tonnes per year for export and the domestic market.
Prumo Logística and Fuella are collaborating to develop a low-carbon hydrogen hub at the Port of Açu, with targeted production of 400,000 tonnes per year for export and the domestic market.
Brazil plans to add 115 GW of new energy capacity by 2034, with a strong contribution from solar and wind power, according to an analysis by Wood Mackenzie.
Brazil plans to add 115 GW of new energy capacity by 2034, with a strong contribution from solar and wind power, according to an analysis by Wood Mackenzie.
Corio Generation and Estaleiros do Brasil (EBR) collaborate to evaluate EBR's infrastructure to support up to 6 GW of offshore wind projects in southern Brazil.
Corio Generation and Estaleiros do Brasil (EBR) collaborate to evaluate EBR's infrastructure to support up to 6 GW of offshore wind projects in southern Brazil.
Intense drought on the Madeira River is forcing Brazil to reduce its dependence on hydroelectricity, in favor of more expensive thermal sources and energy imports from neighboring countries.
Intense drought on the Madeira River is forcing Brazil to reduce its dependence on hydroelectricity, in favor of more expensive thermal sources and energy imports from neighboring countries.
ENGIE Brasil Energia's Serra do Assuruá wind farm complex in Gentio do Ouro, Bahia, has begun commercial operations.
This first phase represents 8% of the project's total installed capacity.
ENGIE Brasil Energia's Serra do Assuruá wind farm complex in Gentio do Ouro, Bahia, has begun commercial operations.
This first phase represents 8% of the project's total installed capacity.