France will be a “major importer of electricity” this winter

France will be "importing a lot of electricity this winter" to compensate for a lack of nuclear production.

Share:

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

France will be “very importing electricity this winter” to compensate for a lack of nuclear production and avoid possible power cuts, said Xavier Piechaczyk, chairman of the board of RTE, the manager of the electricity transmission network, on Franceinfo.

“France is very slightly importing throughout the year and we must bet on a winter where we will be very importing because we need this electricity,” said Xavier Piechaczyk.

Germany, UK, Benelux, Spain…. “We will be globally, we France, importer this winter of all the countries around us,” he added.

“Historically, France was a major exporter because it had a very large nuclear fleet, and now it appears that it has temporary difficulties that will be resolved, but it will take a few years.

In the meantime, we import electricity. And “no country is reluctant to give us electricity if we need it,” he said.

France has a physical import capacity of 15 GW, which represents “a useful part” to cope with a peak electricity consumption of 90 GW, and “helps to avoid blackouts,” he explained.

This winter, France is exposed to the risk of power cuts, particularly due to a low level of nuclear electricity production.

Half of its reactor fleet is unavailable due to scheduled but sometimes prolonged maintenance or corrosion problems.

In this context, the government will send a circular to prefects to anticipate and prepare their departments for possible scheduled power cuts, which could affect 60% of the population but no critical sites or priority customers.

There is “a situation at risk but we should not consider these cuts as a fatality”, reassured Mr. Piechaczyk, recalling the need to reduce consumption.

Electricity consumption in France decreased by 6.7% last week compared to the average of the previous years (2014-2019), a decrease “largely concentrated in the industrial sector”, according to the latest balance sheet of RTE.

This decline, “we begin to see it in individuals, it shuddered … of the order of percent,” said Piechaczyk.

“On the other hand we do not yet see a decrease in consumption in the tertiary sector, that is a problem,” he stressed.

The Province of Zeeland has commissioned a study on the potential deployment of small modular reactors. According to the report, these units could complement offshore wind and planned large-scale nuclear reactors in the country.
The EDF subsidiary will supply three steam turbine and generator sets for the Choczewo nuclear project. This contract is part of Poland's ambitious program to install 15 GW of nuclear capacity.
The British nuclear project reaches a milestone with the delivery of the pressure vessel for the second EPR reactor. This 500-tonne component, manufactured by Framatome in France, arrived at the Somerset site after a multimodal transport journey.
The two publicly traded American companies are exploring the integration of advanced modular microreactors with existing energy infrastructure, targeting federal markets and data centers.
The ACP100 modular reactor, presented as the world's first commercial land-based SMR, successfully completed its non-nuclear turbine test. China National Nuclear Corporation targets commercial operation in the first half of 2026.
Slovak Prime Minister Robert Fico announces the imminent signing of a nuclear agreement with Washington. A new reactor of nearly 1,200 megawatts could be built at the Jaslovské Bohunice site.
The CFE-CGC is alerting the government to risks linked to increased modulation of nuclear reactors, forced to curtail output due to solar and wind production. The union demands the release of an internal EDF study.
The American tech giant and nuclear company TerraPower have concluded an agreement for the construction of eight Natrium reactors. This 2.8 GW capacity is expected to power Meta's data centers starting in 2032.
Hanoi presses Moscow to conclude discussions on a first reactor by January, while seeking a new partner after Japan's withdrawal from the second project.
The restart of the Hamaoka nuclear plant is at risk after Chubu Electric admitted to falsifying seismic data used in the regulatory review, according to Japan’s nuclear authority.
ENGIE has awarded John Cockerill a strategic contract to modernise the natural-draft cooling tower at the Tihange 3 nuclear power plant, mobilising cross-border industrial resources in Belgium and France.
Commonwealth Fusion Systems is developing a digital twin of its SPARC reactor in partnership with Siemens and Nvidia, aiming to drastically reduce design timelines using artificial intelligence and industrial simulation.
IsoEnergy has started extracting 2,000 tonnes of ore at its Tony M site in Utah to gather technical and economic data ahead of a potential production restart.
Polskie Elektrownie Jądrowe has extended its engineering contract with the American consortium, securing continued technical studies and maintaining the timeline for the Lubiatowo-Kopalino nuclear plant.
Unit 2 of the Zhangzhou nuclear power plant, in Fujian province, has officially begun commercial operation after successfully completing all commissioning tests.
Work has begun at the Bailong and Lufeng sites with concrete poured for the nuclear islands, marking the start of construction for two CAP1000 reactors.
French group Orano receives USD900mn in public support to establish a new uranium enrichment facility in Tennessee, as part of a broader US nuclear sector revival plan.
Japan’s nuclear restart effort stalls after Chubu Electric acknowledged a possibly flawed seismic risk estimate at its Hamaoka facility under regulatory review.
Russia has connected its first 1,250 MW VVER-TOI reactor at the Kursk II nuclear power plant to the grid, signalling a key step toward full commissioning by 2034.
Chubu Electric acknowledged a methodological discrepancy in the seismic evaluation of two nuclear reactors, a situation that could weigh on the restart of nuclear operations in Japan.

All the latest energy news, all the time

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.