Decline in the rejection rate for renewable energy projects in France

Find out more about the significant reduction in the refusal rate for renewable energy projects in France, according to the Minister for Energy Transition, Agnès Pannier-Runacher, and the initiatives to promote territorial equity in the development of these energies.

Share:

Éolienne renouvelables

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

The refusal rate for renewable energy projects in France has fallen from over 30% to less than 20% at the prefectoral authorization stage. This positive development comes after intense efforts by prefects and local government departments to remove administrative obstacles to wind, solar and biogas projects.

Unlocking Renewable Energy Projects

Over the past year, Minister Pannier-Runacher has made significant efforts to overcome the administrative obstacles to the development of renewable energies in France. This involved mobilizing prefects to speed up the prefectoral authorization process. The result is a significant drop in the project rejection rate, to below 20%.

The refusal rate for renewable energy projects has long been a point of concern for players in the sector. Administrative red tape and delays in issuing permits were holding back the French energy transition. However, Minister Pannier-Runacher has introduced measures to simplify and speed up the authorization process, with encouraging results.

Impact of Presidential Statements

Onshore wind power has been particularly hard hit by the fluctuations of presidential decisions. President Emmanuel Macron’s statements in 2020 and 2022 have had an impact on prefectoral decisions, notably by advocating a slowdown in the development of this energy. However, the government is now moving towards maintaining the minimum development rate for onshore wind power at 1.5 GW/year, in line with the forthcoming Pluriannual Energy Program (PPE).

These presidential decisions have sparked debate in the renewable energy sector. Some players have expressed concern about the long-term stability of energy policies. Nevertheless, the government now seems determined to maintain a favorable course for the energy transition.

A New Pact with Local Elected Officials

To reach the target of 1.5 GW/year in onshore wind power, the government is proposing a new pact with local elected representatives. The latter will be responsible for defining “acceleration zones” for renewable energies, thus ensuring that specific local features are taken into account and that projects are more acceptable to local residents.

The aim of this partnership with local elected representatives is to involve communities more closely in decisions concerning the implementation of energy projects. It recognizes that the inhabitants of the regions concerned must be involved in the energy development of their territory, thus promoting greater acceptance of the projects.

The future of wind power in France

Minister Pannier-Runacher stresses the importance of territorial equity in the development of renewable energies in France. She insists that the future of wind power cannot be limited to a few territories, while others still have untapped development potential. The quest for territorial equity is at the heart of the government’s strategy for the future of wind power in France.

As a signatory to the Paris Climate Agreement, France is committed to reducing its greenhouse gas emissions and increasing the share of renewable energies in its energy mix. Onshore wind power, solar power and biogas play a key role in achieving these objectives.

In short, Minister Agnès Pannier-Runacher has announced a significant improvement in the approval of renewable energy projects in France. This reduction in the refusal rate is the result of considerable efforts to overcome administrative obstacles and promote a faster energy transition. The government is now working in partnership with local elected representatives to ensure a fair distribution of projects across France, thus ensuring a promising future for renewable energies in France.

National operator PSE partners with armed forces to protect transformer stations as critical infrastructure faces sabotage linked to foreign interference.
Kazakhstan plans to allocate 3 GW of wind and solar projects by the end of 2026 through public tenders, with a first 1 GW tranche in 2025, amid efforts to modernise its power system.
Hurricanes Beryl, Helene and Milton accounted for 80% of electricity outages recorded in 2024, marking a ten-year high according to federal data.
The French Energy Regulatory Commission introduces a temporary prudential control on gas and electricity suppliers through a “guichet à blanc” opening in December, pending the transposition of European rules.
The Carney–Smith agreement launches a new pipeline to Asia, removes oil and gas emission caps, and initiates reform of the Pacific north coast tanker ban.
The gradual exit from CfD contracts is turning stable assets into infrastructures exposed to higher volatility, challenging expected returns and traditional financing models for the renewable sector.
The Canadian government introduces major legislative changes to the Energy Efficiency Act to support its national strategy and adapt to the realities of digital commerce.
Quebec becomes the only Canadian province where a carbon price still applies directly to fuels, as Ottawa eliminated the public-facing carbon tax in April 2025.
New Delhi launches a 72.8 bn INR incentive plan to build a 6,000-tonne domestic capacity for permanent magnets, amid rising Chinese export restrictions on critical components.
The rise of CfDs, PPAs and capacity mechanisms signals a structural shift: markets alone no longer cover 10–30-year financing needs, while spot prices have surged 400% in Europe since 2019.
Germany plans to finalise the €5.8bn ($6.34bn) purchase of a 25.1% stake in TenneT Germany to strengthen its control over critical national power grid infrastructure.
The Ghanaian government is implementing a reform of its energy system focused on increasing the use of local natural gas, aiming to reduce electricity production costs and limit the sector's financial imbalance.
On the 50th anniversary of its independence, Suriname announced a national roadmap including major public investment to develop its offshore oil reserves.
In its latest review, the International Energy Agency warns of structural blockages in South Korea’s electricity market, calling for urgent reforms to close the gap on renewables and reduce dependence on imported fossil fuels.
China's power generation capacity recorded strong growth in October, driven by continued expansion of solar and wind, according to official data from the National Energy Administration.
The 2026–2031 offshore programme proposes opening over one billion acres to oil exploration, triggering a regulatory clash between Washington, coastal states and legal advocacy groups.
The government of Mozambique is consolidating its gas transport and regasification assets under a public vehicle, anchoring the strategic Beira–Rompco corridor to support Rovuma projects and respond to South Africa’s gas dependency.
The British system operator NESO initiates a consultation process to define the methodology of eleven upcoming regional strategic plans aimed at coordinating energy needs across England, Scotland and Wales.
The Belém summit ends with a technical compromise prioritising forest investment and adaptation, while avoiding fossil fuel discussions and opening a climate–trade dialogue likely to trigger new regulatory disputes.
The Asian Development Bank and the Kyrgyz Republic have signed a financing agreement to strengthen energy infrastructure, climate resilience and regional connectivity, with over $700mn committed through 2027.

All the latest energy news, all the time

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.