BOEM: consultation for wind power development in the Central Atlantic

The Bureau of Ocean Energy Management (BOEM) is initiating a public consultation to identify new offshore wind development zones in the Central Atlantic, reinforcing the goal of 30 GW by 2030.

Share:

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

The Bureau of Ocean Energy Management (BOEM) has just launched a public consultation aimed at defining new zones for offshore wind development in the Central Atlantic region.
This initiative is in line with the United States’ energy strategy, which aims to significantly increase renewable energy production capacity, particularly offshore.
This consultation follows an initial sale of concessions in the same region, concluded in August 2024, and aims to explore in greater detail the opportunities offered by the Central Atlantic.
The initiative covers the coasts of New Jersey, Delaware, Maryland, Virginia and North Carolina. BOEM is soliciting comments and proposals from stakeholders to identify the most suitable areas for the installation of wind infrastructure.
This approach aims to balance energy needs while minimizing potential conflicts with other maritime activities, such as fishing and shipping.

Environmental analysis and inter-institutional consultations

As part of this process, BOEM will undertake an in-depth analysis of the proposed areas, in collaboration with federal agencies such as the National Oceanic and Atmospheric Administration’s National Centers for Coastal Ocean Science.
The aim is to ensure that the projects selected respect environmental constraints and do not significantly interfere with existing economic activities.
The results of this consultation, which closes on October 21, 2024, will guide decisions on future concession areas.
BOEM then plans to carry out detailed environmental studies to validate the viability of the selected sites before proceeding with any auctions.
This consultation phase is crucial for adjusting offshore wind turbine siting strategies and optimizing the exploitation of marine resources, while taking into account the various interests involved.

The Kagurayama onshore wind farm (61.1 MW) begins operations under a secured 2017 FIT tariff, despite grid injection limits and a multi-stakeholder local governance model.
The Trump administration has ordered the immediate halt of five major offshore wind construction sites in the Atlantic, citing national security threats and drawing mixed reactions from industry and political circles.
Policy reversals, reduced performance and corporate disengagement marked an unprecedented slowdown in wind power in 2025, although China continued its expansion at a steady pace.
The Québec government has approved three wind projects totalling 792 MW to meet growing energy demand and support regional economies in Bas-Saint-Laurent and Capitale-Nationale.
French group ENGIE has officially commissioned the Serra do Assuruá complex in the State of Bahia, making it its largest onshore wind project worldwide.
RWE signed a 15-year power purchase agreement with Indiana Michigan Power for the Prairie Creek project, aimed at supporting Indiana’s growing electricity demand starting in 2028.
EDP has signed a long-term electricity supply agreement with Energa for a 322 MW hybrid portfolio combining wind and solar, marking one of the largest contracts of its kind in Poland.
TerraWind Renewables acquires five projects totalling 255MW in northern Japan, bringing its onshore wind development capacity to 327MW and targeting first commercial operation in 2028.
A consortium led by EDF power solutions has signed a 20-year agreement with Nama PWP to develop a 120 MW wind farm in southeastern Oman, with commissioning scheduled for Q3 2027.
Microsoft expands its partnership with Iberdrola through two new power purchase agreements in Spain, reinforcing its European energy strategy while deepening the use of cloud and artificial intelligence solutions from the US group.
Casa dos Ventos awards Vestas the supply, construction and maintenance of a 184-turbine complex in the state of Piauí, with an investment exceeding $1.01bn.
Warsaw tests long-term support for offshore wind with a structured tender to maximise competition, reduce financial risk and reassure a supply chain under pressure across Europe.
TotalEnergies has sold 50% of a portfolio of wind and solar projects in Greece to Asterion Industrial Partners, valued at €508mn ($554mn), while retaining operational control and the main share of electricity marketing.
Italy’s offshore wind rollout remains at a standstill, freezing over 18 GW of pending projects and weakening national renewable energy targets.
German manufacturer Nordex has secured an order for 34 turbines for a 200 MW project in the Canadian province of New Brunswick, marking its first entry into this region.
OX2 has started construction on three new onshore wind farms in Finland, bringing its total installed capacity in the country to 750 MW, a record level for a private energy sector player.
Italian group Enel has acquired two onshore wind farms in Germany for an enterprise value of €80mn ($86.5mn), strengthening its presence in a stable and strategic market as part of a targeted asset transfer.
EDF power solutions announces commercial operation of the San Kraal wind farm, the first unit of the 420MW Koruson 1 project, with full commissioning expected in early 2026.
Q ENERGY has announced the entry of three local and citizen-based partners into the capital of the Ventajou wind farm, marking its first strategic equity opening to institutional and community investors.
The Norwegian government has allocated two areas of the Utsira Nord project to the Equinor–Vårgrønn and EDF–Deep Wind Offshore consortia, launching a preparatory phase before a competitive state aid auction.

All the latest energy news, all the time

Annual subscription

8.25$/month*

*billed annually at 99$/year for the first year then 149,00$/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2$/month*
then 14.90$ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.