Marubeni launches Innovative Floating Wind Project in Akita

Marubeni Corporation launches a floating offshore wind project in Akita, supported by the NEDO Green Innovation Fund, aimed at reducing costs and stimulating innovation in the sector.

Share:

Réduction des coûts éolien flottant

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25€/month*

*billed annually at 99€/year for the first year then 149,00€/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2€/month*
then 14.90€ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

The renewable energy sector takes another step forward with the launch of the Southern Akita Floating Offshore Wind Demonstration Project by Marubeni Corporation and its subsidiary Marubeni Offshore Wind Development Corporation (MOWD). This project, supported by the New Energy and Industrial Technology Development Organization (NEDO), aims to reduce the costs of floating offshore wind power and facilitate its international adoption. Japan, meanwhile, has been stepping up offshore wind power development in recent years.
The MOWD-led consortium includes Akita Floating Offshore Wind Corporation, Tohoku Electric Power Co, Inc, Japan Marine United Corporation, TOA CORPORATION, TOKYO SEIKO ROPE MFG. CO, LTD, Kanden Plant Corporation, JFE Engineering Corporation, and NAKANIHON AIR Co, Ltd. Together, they plan to install two wind turbines of over 15 MW each, located at a depth of around 400 meters off the southern coast of Akita Prefecture.

Challenges and Opportunities of Floating Offshore Wind Energy

Floating offshore wind power is seen as a promising solution for increasing energy production capacity while reducing costs in the long term, as envisaged by Patten Energy’s project to develop offshore wind power in Japan. Unlike fixed wind turbines, floating structures can be installed in deeper and wider marine areas, offering greater flexibility and higher energy production potential. This project in Akita represents a crucial step towards commercializing this technology at competitive costs on an international scale by 2030.
Marubeni’s participation in this project is part of a broader strategy to develop floating offshore wind energy. Marubeni is already involved in demonstration projects in Fukushima and Kitakyushu, and has secured seabed leasing rights in Scotland for a similar project. These initiatives aim to build a robust supply chain and accelerate the adoption of floating wind power.

Economic impact and future prospects

The project should not only reduce energy production costs, but also stimulate the local economy by creating jobs and developing specialized skills. The project is scheduled to enter commercial operation in autumn 2029, with deployment scheduled from July 2024 to March 2031.
The collaboration between various industrial partners and NEDO’s ongoing support illustrate Japan’s commitment to innovation in the field of renewable energies. The ultimate goal is to develop technologies that are competitive on the world market, strengthening Japan’s position as a leader in the renewable energy sector.

The Chinese wind turbine manufacturer and Saudi operator sign a seven-year framework agreement to deploy local production lines and enhance technological cooperation in several strategic markets.
Iberdrola has installed the high-voltage direct current converter station for its East Anglia THREE wind farm, marking a key milestone in a €5 billion project.
Driven by solid operational performance, Nordex has raised its 2025 EBITDA margin forecast to 7.5–8.5%, up from the previous 5–7%, following a significant improvement in preliminary third-quarter results.
Neoen’s Goyder South Wind Farm reaches full generation capacity, strengthening the French group’s presence in Australia’s energy market with 412 MW connected to the grid.
The Australian government has granted environmental approval for the 108 MW Waddi Wind Farm, a Tilt Renewables project with construction costs exceeding $400mn.
The 180 MW Nimbus wind project enters its final phase of construction in Arkansas, with commercial operation scheduled for early 2026.
Faced with market uncertainty in Europe, Siemens Gamesa pauses a planned industrial investment in Esbjerg, highlighting structural difficulties in the offshore wind sector.
Institutional deadlock in France delays tenders and weakens the offshore wind sector, triggering job cuts and major industrial withdrawals from the market.
The Lithuanian energy group has signed a EUR 318 million financing agreement for its 314 MW wind project, the largest in the Baltic states.
German group BayWa r.e. has tasked Enercoop Bretagne with implementing a citizen investment scheme for its planned wind farm in Plouisy, aiming for shared governance and stronger local involvement.
US wind capacity fell in Q2, but developers anticipate a sharp increase by late 2025, with 46 GW of new capacity forecast by 2029 and a peak in 2027.
Engie has signed a renewable electricity supply contract with Apple covering 173 MW of installed capacity in Italy, with commissioning scheduled between 2026 and 2027.
Renova a soumis une méthodologie d’évaluation environnementale pour un projet éolien terrestre de 280MW à Higashidori, renforçant son positionnement sur les technologies renouvelables au Japon.
The joint venture between BP and JERA ends its offshore wind ambitions in the United States, citing an unfavourable economic and regulatory environment for continuing the development of the Beacon Wind project.
With a 300 MW partnership signed with Nadara, Q ENERGY exceeds 1 GW of wind repowering projects in France, reinforcing its position in a market driven by public investment dynamics.
The acquisition of Cosmic Group by FairWind consolidates its position in Australia and marks a strategic expansion into New Zealand and Japan.
Danish manufacturer Vestas has paused construction of its planned facility in Poland, originally set for 2026, citing weaker-than-expected European offshore wind demand.
British operator Equitix has been selected to take over transmission assets of the Neart na Gaoithe offshore wind farm, a £450mn ($547mn) project awarded under Ofgem’s tenth tender round.
Energiequelle GmbH has launched replacement work for old turbines at its Minden-Hahlen site, aiming for long-term structural maintenance with the installation of three new 200-metre machines.
GE Vernova will equip the Ialomiţa wind farm with 42 turbines of 6.1 MW, strengthening its presence in the European onshore wind sector with a 252 MW project in partnership with Greenvolt.

All the latest energy news, all the time

Annual subscription

8.25€/month*

*billed annually at 99€/year for the first year then 149,00€/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2€/month*
then 14.90€ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.