Marubeni launches Innovative Floating Wind Project in Akita

Marubeni Corporation launches a floating offshore wind project in Akita, supported by the NEDO Green Innovation Fund, aimed at reducing costs and stimulating innovation in the sector.

Share:

Réduction des coûts éolien flottant

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25€/month*

*billed annually at 99€/year for the first year then 149,00€/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2€/month*
then 14.90€ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

The renewable energy sector takes another step forward with the launch of the Southern Akita Floating Offshore Wind Demonstration Project by Marubeni Corporation and its subsidiary Marubeni Offshore Wind Development Corporation (MOWD). This project, supported by the New Energy and Industrial Technology Development Organization (NEDO), aims to reduce the costs of floating offshore wind power and facilitate its international adoption. Japan, meanwhile, has been stepping up offshore wind power development in recent years.
The MOWD-led consortium includes Akita Floating Offshore Wind Corporation, Tohoku Electric Power Co, Inc, Japan Marine United Corporation, TOA CORPORATION, TOKYO SEIKO ROPE MFG. CO, LTD, Kanden Plant Corporation, JFE Engineering Corporation, and NAKANIHON AIR Co, Ltd. Together, they plan to install two wind turbines of over 15 MW each, located at a depth of around 400 meters off the southern coast of Akita Prefecture.

Challenges and Opportunities of Floating Offshore Wind Energy

Floating offshore wind power is seen as a promising solution for increasing energy production capacity while reducing costs in the long term, as envisaged by Patten Energy’s project to develop offshore wind power in Japan. Unlike fixed wind turbines, floating structures can be installed in deeper and wider marine areas, offering greater flexibility and higher energy production potential. This project in Akita represents a crucial step towards commercializing this technology at competitive costs on an international scale by 2030.
Marubeni’s participation in this project is part of a broader strategy to develop floating offshore wind energy. Marubeni is already involved in demonstration projects in Fukushima and Kitakyushu, and has secured seabed leasing rights in Scotland for a similar project. These initiatives aim to build a robust supply chain and accelerate the adoption of floating wind power.

Economic impact and future prospects

The project should not only reduce energy production costs, but also stimulate the local economy by creating jobs and developing specialized skills. The project is scheduled to enter commercial operation in autumn 2029, with deployment scheduled from July 2024 to March 2031.
The collaboration between various industrial partners and NEDO’s ongoing support illustrate Japan’s commitment to innovation in the field of renewable energies. The ultimate goal is to develop technologies that are competitive on the world market, strengthening Japan’s position as a leader in the renewable energy sector.

The Kagurayama onshore wind farm (61.1 MW) begins operations under a secured 2017 FIT tariff, despite grid injection limits and a multi-stakeholder local governance model.
The Trump administration has ordered the immediate halt of five major offshore wind construction sites in the Atlantic, citing national security threats and drawing mixed reactions from industry and political circles.
Policy reversals, reduced performance and corporate disengagement marked an unprecedented slowdown in wind power in 2025, although China continued its expansion at a steady pace.
The Québec government has approved three wind projects totalling 792 MW to meet growing energy demand and support regional economies in Bas-Saint-Laurent and Capitale-Nationale.
French group ENGIE has officially commissioned the Serra do Assuruá complex in the State of Bahia, making it its largest onshore wind project worldwide.
RWE signed a 15-year power purchase agreement with Indiana Michigan Power for the Prairie Creek project, aimed at supporting Indiana’s growing electricity demand starting in 2028.
EDP has signed a long-term electricity supply agreement with Energa for a 322 MW hybrid portfolio combining wind and solar, marking one of the largest contracts of its kind in Poland.
TerraWind Renewables acquires five projects totalling 255MW in northern Japan, bringing its onshore wind development capacity to 327MW and targeting first commercial operation in 2028.
A consortium led by EDF power solutions has signed a 20-year agreement with Nama PWP to develop a 120 MW wind farm in southeastern Oman, with commissioning scheduled for Q3 2027.
Microsoft expands its partnership with Iberdrola through two new power purchase agreements in Spain, reinforcing its European energy strategy while deepening the use of cloud and artificial intelligence solutions from the US group.
Casa dos Ventos awards Vestas the supply, construction and maintenance of a 184-turbine complex in the state of Piauí, with an investment exceeding $1.01bn.
Warsaw tests long-term support for offshore wind with a structured tender to maximise competition, reduce financial risk and reassure a supply chain under pressure across Europe.
TotalEnergies has sold 50% of a portfolio of wind and solar projects in Greece to Asterion Industrial Partners, valued at €508mn ($554mn), while retaining operational control and the main share of electricity marketing.
Italy’s offshore wind rollout remains at a standstill, freezing over 18 GW of pending projects and weakening national renewable energy targets.
German manufacturer Nordex has secured an order for 34 turbines for a 200 MW project in the Canadian province of New Brunswick, marking its first entry into this region.
OX2 has started construction on three new onshore wind farms in Finland, bringing its total installed capacity in the country to 750 MW, a record level for a private energy sector player.
Italian group Enel has acquired two onshore wind farms in Germany for an enterprise value of €80mn ($86.5mn), strengthening its presence in a stable and strategic market as part of a targeted asset transfer.
EDF power solutions announces commercial operation of the San Kraal wind farm, the first unit of the 420MW Koruson 1 project, with full commissioning expected in early 2026.
Q ENERGY has announced the entry of three local and citizen-based partners into the capital of the Ventajou wind farm, marking its first strategic equity opening to institutional and community investors.
The Norwegian government has allocated two areas of the Utsira Nord project to the Equinor–Vårgrønn and EDF–Deep Wind Offshore consortia, launching a preparatory phase before a competitive state aid auction.

All the latest energy news, all the time

Annual subscription

8.25€/month*

*billed annually at 99€/year for the first year then 149,00€/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2€/month*
then 14.90€ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.