Entech and Primeo Energie launch joint venture for 100 MW of battery storage by 2029

Entech and Primeo Energie create Primtech Batteries to develop battery electricity storage projects in France and the European Union, targeting 100 MW installed by 2029.

Share:

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25€/month*

*billed annually at 99€/year for the first year then 149,00€/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2€/month*
then 14.90€ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

Entech and Swiss-based Primeo Energie have formalised the creation of a joint venture named Primtech Batteries, dedicated to the development, construction and operation of stationary battery storage projects. The partnership aims to reach a total installed capacity of at least 100 megawatts by 2029, focusing initially on the French market, with potential expansion into other European Union countries.

A rapidly growing European market

The increasing demand for storage systems is driven by the rise of intermittent renewable energy sources and the need to ensure grid flexibility. While some European markets have already invested heavily in stationary battery systems, France still has relatively few large-capacity installations. In this context, Primtech Batteries will leverage Entech’s industrial experience in storage system development and construction, and Primeo Energie’s expertise in asset management and optimisation.

The first project, with a capacity of 14 megawatts, has received the necessary approvals and will be built during 2026, with commissioning scheduled for the end of the year. Several similar-capacity projects are currently under preparation, with deployment expected from 2027 onwards.

Balanced division of responsibilities

Entech will be responsible for the engineering, construction and maintenance of the infrastructure, while Primeo Energie will oversee battery value optimisation on electricity markets, including system services, capacity mechanisms, Day-Ahead trading and Intraday markets. The goal is to maximise revenues generated by these assets by integrating them efficiently into existing market mechanisms.

Primtech Batteries will have an equally shared ownership structure, with both partners holding 50% of capital and voting rights. The governance model includes a chairman representing Primeo Energie and a managing director appointed by Entech, both with equal authority.

Strategic positioning for both companies

This initiative aligns with Entech’s strategic roadmap to expand in the energy storage sector. For Primeo Energie, the project strengthens its activities in decentralised energy solutions, betting on the economic potential of stationary storage to address grid balancing challenges.

Sinexcel has installed a 2MW/8MWh energy storage system in Matsusaka, marking a breakthrough in a regulated market after five years of technical partnerships and gradual deployment in Japan.
Inlyte Energy has successfully completed factory validation testing of its first full-scale iron-sodium battery, witnessed by Southern Company, paving the way for a pilot installation in the United States in early 2026.
Neoen begins construction of a new 305 MW stage in Australia, raising its total battery storage capacity in the country to 2 GW, and signs two additional virtual battery contracts with ENGIE.
ENGIE has awarded NHOA Energy the contract for a 320 MWh battery energy storage system in Drogenbos, marking a new step in their industrial partnership in Belgium.
Stardust Power has completed an independent review of its lithium refinery project in Muskogee, confirming technical feasibility and compliance with industry standards for its initial production phase.
California-based battery manufacturer South 8 Technologies has secured $11mn to boost production of its LiGas cells, targeting military and space applications under extreme conditions.
Samsung SDI will supply LFP cells for energy storage systems in the United States starting in 2027, under a multi-year deal valued at $1.53bn.
Bitzero Holdings launches a new 70 MW expansion phase in Namsskogan, Norway, targeting a total capacity of 110 MW and an upgrade of its high-performance computing capabilities.
Remixpoint and Nippon Chikudenchi have formalised a partnership to develop seven 2MW/8MWh BESS facilities by October 2026 through a newly established joint venture.
UK-based Ray Systems has selected Beam Global to supply tailored battery systems for its new autonomous underwater drones, aiming to extend mission duration without compromising stealth or manoeuvrability.
Sungrow has started construction on a 200 MW/400 MWh battery storage system for ENGIE, aimed at strengthening grid stability in a state heavily reliant on renewable energy.
Blue Current secures over $80mn in funding led by Amazon to industrialise its silicon solid-state batteries for large-scale mobility and stationary applications.
AGL has begun construction of a 500 MW battery storage system in Tomago, a project valued at AUD800mn ($530.8mn), in the Hunter region, with commissioning expected in 2027.
Real estate group JALCO Holdings diversifies its activities by investing in a 2 MW/8.1 MWh battery energy storage system developed by Taoke Energy in Narita, Chiba Prefecture.
BKW is conducting feasibility studies on four sites to assess the profitability and development conditions for large-scale battery storage installations in Switzerland.
A 300 MW/1,200 MWh electrochemical energy storage facility has been commissioned in China, marking a major milestone in the country’s largest publicly funded energy infrastructure project.
Sustainable Holdings is developing a battery storage facility in Matsusaka, with operations scheduled to begin in June 2026 on Japan’s electricity market.
California-based Korbel Winery is now equipped with an integrated energy storage and intelligent control system, installed by Energy Toolbase and BPi, to optimise usage and address local grid constraints.
The 200 MW Greenwater battery storage project enters execution phase following a $400mn bank financing, marking a strategic milestone in the Pacific Northwest’s energy infrastructure development.
Solar with batteries becomes a bankability lever in three key ASEAN markets, where the focus shifts from cost reduction to the monetisation of energy flexibility.

All the latest energy news, all the time

Annual subscription

8.25€/month*

*billed annually at 99€/year for the first year then 149,00€/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2€/month*
then 14.90€ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.