Vestas doubles production capacity in Poland to support German demand

Danish group Vestas is expanding its blade plant in Poland and creating more than 300 jobs to supply turbines to Germany, the leading onshore wind market in Europe.

Share:

Comprehensive energy news coverage, updated nonstop

Annual subscription

8.25€/month*

*billed annually at 99€/year for the first year then 149,00€/year ​

Unlimited access • Archives included • Professional invoice

OTHER ACCESS OPTIONS

Monthly subscription

Unlimited access • Archives included

5.2€/month*
then 14.90€ per month thereafter

FREE ACCOUNT

3 articles offered per month

FREE

*Prices are excluding VAT, which may vary depending on your location or professional status

Since 2021: 35,000 articles • 150+ analyses per week

Danish wind turbine manufacturer Vestas will double the production capacity of its blade plant located in Goleniow, north-western Poland. This industrial upgrade is part of a broader effort to meet rising demand in the European market, particularly in Germany, where onshore wind is rapidly accelerating.

Strengthening production for the V172-7.2 MW turbine

The plant expansion will add a second production line dedicated to blades for the V172-7.2 MW model, designed for high-capacity onshore installations. Vestas stated that this production will mainly target the growing German market. Germany installed 2.2 gigawatts (GW) of onshore wind in the first half of 2025, a 67% increase compared to the previous year.

Projections show the German market could reach 5.1 GW of installations for the full year, reinforcing its position as the largest onshore wind market in Europe. In this context, Vestas’ capacity ramp-up represents a direct industrial response to regional demand growth.

Consolidating operations in Poland

The Goleniow facility, acquired in September from LM Wind Power, is now integrated into Vestas’ wider European manufacturing network. The Danish group currently operates ten industrial sites across the continent. In Poland, Vestas employs around 2,300 people, with more than 300 new hires planned to support the expansion.

Goleniow was chosen for its established industrial base and proximity to key Central European markets. This localisation strategy aims to streamline logistics while ensuring supply chain continuity for European clients.

A regional demand-oriented industrial partnership

With this expansion, Vestas confirms its regionalised production strategy focused on high-growth markets. By supplying Germany directly from Poland, the manufacturer enhances its competitiveness by reducing logistical costs and improving supply chain responsiveness.

The project forms part of a broader industrial coordination effort across Vestas’ European sites, seeking to pool resources in support of onshore wind development across the continent. This operational partnership between Poland and Germany reflects the evolving renewable energy value chains at the regional level.

Infinity Power has started work on its 200 MW wind project in Ras Ghareb, strengthening its position in the African market with technical support from China's POWERCHINA Huadong.
A partnership between the European Investment Bank and Crédit Agricole CIB aims to generate up to €8 billion in wind energy investments across the European Union through a bank guarantee mechanism.
With a €600mn ($652mn) contribution, the European Investment Bank becomes the main lender of the BC-Wind offshore wind project developed by Ocean Winds off the Polish coast.
Cadeler has taken delivery of its tenth wind turbine installation vessel, Wind Mover, delivered ahead of schedule and immediately deployed in Europe, strengthening its capabilities amid rising industrial demand.
Levanta Renewables partners with Triconti Windkraft Group to develop an onshore wind farm in Quezon province, scheduled to begin operations in 2028.
BW Ideol Projects Company acquires a minority stake in the Méditerranée Grand Large project, strengthening its partnership with EDF power solutions and Maple Power in the Mediterranean floating offshore wind sector.
Octopus Energy joins a global initiative to accelerate renewable energy deployment in Africa, committing $450mn through its Power Africa programme to supply electricity to more than one million people.
Australian energy provider Snowy Hydro has secured long-term agreements with Aula Energy and TagEnergy, adding 120 MW of wind power and 105 MW of battery storage to its national portfolio.
The He Dreiht offshore wind farm delivers its first MWh as the German auction model stalls, offering EnBW and its institutional investors a strategic showcase.
The Irish government has provisionally awarded development rights for the Tonn Nua offshore site to the Ørsted-ESB joint venture under a 20-year contract supporting a 900 MW project.
Nordex Group will supply six turbines to upgrade a 34.2 MW wind farm in Caparroso, financed by the European Union under the NextGenerationEU plan.
The Spanish group continues its asset rotation strategy by transferring its French onshore wind and solar portfolio to Technique Solaire, reinforcing its focus on offshore and regulated networks.
Japanese group Eurus Energy has completed the environmental assessment for its 60.2MW repowering project in Wakkanai, with commissioning targeted for April 2029.
BayWa r.e. has reached a strategic milestone with the concept certification of its BayFloat floating substructure, validated by DNV according to current floating offshore wind standards.
A full-scale testing programme will begin in January to assess a blade reinforcement technology developed by Bladena, as ageing offshore wind fleets raise durability challenges.
Africa's first wind project led by a Chinese company, the De Aar plant generates 770 million kWh annually and focuses on developing local talent.
SPIE Wind Connect has been selected by DEME Offshore to carry out all connection and high-voltage cable testing work for the 3.6 GW Dogger Bank offshore wind project off the UK coast.
German group Nordex will supply three turbines to developer BMR for a 21 MW project in North Rhine-Westphalia, bringing BMR's total orders to nearly 110 MW in 2025.
Q ENERGY is simultaneously conducting the repowering and extension of its wind farm in Aude, with commissioning scheduled for late 2026 and a production goal equivalent to the consumption of 45,000 people.
Cordelio Power has launched commercial operations of the Crossover wind farm in Arkansas, securing a 20-year power purchase agreement with Microsoft and closing $811mn in financing from North American banks.

All the latest energy news, all the time

Annual subscription

8.25€/month*

*billed annually at 99€/year for the first year then 149,00€/year ​

Unlimited access - Archives included - Pro invoice

Monthly subscription

Unlimited access • Archives included

5.2€/month*
then 14.90€ per month thereafter

*Prices shown are exclusive of VAT, which may vary according to your location or professional status.

Since 2021: 30,000 articles - +150 analyses/week.